Template:Infobox pipeline
| This template uses Lua: |
Usage
| {{{name}}} | |
|---|---|
| [[File:{{{photo}}}|{{{photo_size}}}|alt={{{photo_alt}}}|{{{caption}}}]] {{{caption}}} | |
| [[File:{{{map}}}|{{{map_size}}}|alt={{{map_alt}}}|{{{map_caption}}}]] {{{map_caption}}} | |
| Location | |
| Country | {{{country}}} |
| State | {{{state}}} |
| Province | {{{province}}} |
| Coordinates | {{{coordinates}}} |
| General direction | {{{direction}}} |
| From | {{{start}}} |
| Passes through | {{{through}}} |
| To | {{{finish}}} |
| Runs alongside | {{{par}}} |
| General information | |
| Type | {{{type}}} |
| Status | {{{status}}} |
| Owner | {{{owner}}} |
| Partners | {{{partners}}} |
| Operator | {{{operator}}} |
| Technical service provider | {{{technical_service_provider}}} |
| Contractors | {{{contractors}}} |
| Construction started | {{{construction}}} |
| Expected | {{{expected}}} |
| Commissioned | {{{est}}} |
| Decommissioned | {{{decom}}} |
| Technical information | |
| Length | 0 km (0 mi) |
| Maximum discharge | 0 million barrels per day (~0 t/a) |
| Diameter | 0 mm (0 in) |
| No. of compressor stations | {{{compressor_stations_no}}} |
| Compressor stations | {{{compressor_stations}}} |
| No. of pumping stations | {{{pumping_stations_no}}} |
| Pumping stations | {{{pumping_stations}}} |
{{Infobox pipeline
| name =
| type =
| photo =
| caption =
| map =
| country =
| state =
| province =
| coordinates = <!-- {{coord|LAT|LON|type:landmark_region:XX|display=inline,title}} -->
| direction =
| start =
| through =
| finish =
| par =
| status =
| owner =
| partners =
| operator =
| technical_service_provider =
| pipe_manufacturer =
| pipe_installer =
| pipe_layer =
| contractors =
| construction =
| expected =
| est =
| decom =
| length =
| length_mi =
| discharge =
| discharge_bbl_d =
| diameter_mm =
| diameter_in =
| compressor_stations_no =
| compressor_stations =
| pumping_stations_no =
| pumping_stations =
}}
Parameters
All fields used by this template are optional. The following fields are available:
No description.
| Parameter | Description | Type | Status | |
|---|---|---|---|---|
| Name | name | name of pipeline (if none is provided, article name will be used) | String | optional |
| Type | type | type of pipeline
| Unknown | suggested |
| Photo | photo | generic image of the pipeline | File | optional |
| Photo size | photo_size | no description | Unknown | optional |
| Alternate text for photo | photo_alt | no description | Unknown | optional |
| Caption | caption | caption for the pipeline image | Unknown | optional |
| Map | map | map image displaying the pipeline | File | optional |
| map_size | map_size | no description | Unknown | optional |
| map_alt | map_alt | no description | Unknown | optional |
| map_caption | map_caption | no description | Unknown | optional |
| Country | country | declare the country(ies) where the pipeline is located. Do not use flag icons, as this places an unnecessary emphasis on nationality; see [[MOS:FLAG]] for a detailed rationale. | Unknown | optional |
| State | state | declare the state(s) where the pipeline is located | Unknown | optional |
| Province | province | no description | Unknown | optional |
| Coordinates | coordinates | the coordinates of the start or end. Add latitude and longitude with Template:Coord. Add parameter display=inline,title | Unknown | optional |
| Start | start | starting point | Unknown | optional |
| Through | through | list of major suburbs/towns it traverses | Unknown | optional |
| Finish | finish | finishing point | Unknown | optional |
| Runs alongside | par | parallel rivers, roads, ranges, other pipelines etc. | Unknown | optional |
| General direction | direction | general direction of the pipeline
| Unknown | optional |
| Owner | owner | companies owning the pipeline | Unknown | optional |
| Partners | partners | projects partners, companies owning the pipeline's owning company (if established as a special project) | Unknown | optional |
| Operator | operator | company operating the pipeline | Unknown | optional |
| Technical service provider | technical_service_provider | company providing technical services for operating the pipeline (if different from the operator) | Unknown | optional |
| Pipe manufacturer | pipe_manufacturer | company/ies who manufactured pipes for the pipeline | Unknown | optional |
| Pipe installer | pipe_installer | company/ies who laid pipes | Unknown | optional |
| Pipe layer | pipe_layer | pipes laying vessel (for offshore pipelines only) | Unknown | optional |
| Contractors | contractors | no description | Unknown | optional |
| Construction started | construction | date or year construction started | Date | optional |
| Expected commissioning | expected | date or year of expected commissioning for planned or under construction pipelines | Date | optional |
| Commissioned | est | date or year the pipeline commissioned or inaugurated | Unknown | optional |
| Decommissioned | decom | date or year the pipeline decommissioned | Date | optional |
| status | status | no description | Unknown | optional |
| Length (km) | length length_km | Length of the pipeline in kilometres | Unknown | optional |
| Length (miles) | length_mi | If English system is desired, length of the pipeline in miles | Number | optional |
| Discharge | discharge | maximum discharge of the pipeline | Unknown | optional |
| Discharge (million bbl/d) | discharge_bbl_d | maximum discharge of the oil pipeline if barrels per day desired. number in million oil barrels per day (will be automatically converted to tonnes per year at the [[API gravity]] 33.4. If the pipeline is used for oil with different API gravity factor, please use "discharge" parameter instead of "discharge_bbl/d". Don't use together with "discharge". | Number | optional |
| Diameter (inches) | diameter_in | If English system is desired, diameter of the pipeline in inches | Number | optional |
| Diameter (mm) | diameter_mm | diameter of the pipeline in millimetres. Will be automatically converted. | Number | optional |
| Pressure | pressure | no description | Unknown | optional |
| Compression stations (total number) | compressor_stations_no | number of compressor stations | Number | optional |
| Compressor stations | compressor_stations | names of compressor stations | Unknown | optional |
| Pumping stations (total number) | pumping_stations_no | number of pumping stations | Number | optional |
| Pumping stations | pumping_stations | names of pumping stations | Unknown | optional |
| Website | website | no description | Unknown | optional |
- Most pipelines will use "length_km" since they are not in the US or UK. If the pipeline is in the US or UK, and you would like miles to display before kilometres, use "length_mi". Don't use both parameters together.
- Most pipelines will use "diameter_mm" since they are not in the US or UK. If the pipeline is in the US or UK, and you would like inches to display before millimeters, use "diameter_in". Don't use both parameters together.