BRT systems by country
The term bus rapid transit  systemBRT system ) has been applied to a wide range of bus , trolleybus , and electric bus  systems. In 2012, the Institute for Transportation and Development Policy  (ITDP) published a BRT Standard  to make it easier to standardize and compare bus services.
The below list only includes BRT systems that are in operation or under construction.
Marechal Floriano BRT station on Curitiba 's RIT  Green Line (Linha Verde ) Glider (Belfast)  bus, Fisherwick PlaceStatus (background color) White : OperationalLight blue : Under constructionCity 
Primary city served by the buses and trolleybus. 
System name 
The English name of the bus rapid transit or overview article for city. 
Operator 
Operating the main bus services along its designated route. 
Began 
The year that the bus rapid transit began operating for passenger service. 
Stations 
Stations connected by transfers are counted as one station, unless otherwise note. 
Length (km) 
Track length; lines which share track are counted once or Corridor length; lines which sharing the same corridor are counted once. 
Notes/Description 
A short objective description and subjective of routes bus rapid transit ridership and passengers (daily). 
Type 
eBRT - Electric Bus Rapid Transit, using Trolleybuses  or eBRT using Electric buses  or other source. 
BRT certified 
ITDP  standards-and-guides and bus-rapid-transit-standard year rewards.In the following table, BRT systems in light blue are under construction.
BRT systems in Ethiopia 
 
City
 
System name
 
Began
 
Lines
 
Stations
 
Length
 
Notes/Description
 
Type
 
BRT certified
  
Addis Ababa 
-
 
-
 
2
 
-
 
15.3 km (9.5 mi)
 
Under construction[ 1]  
 
Not BRT certified in 2024.[ 2]   
In the following table, BRT systems in light blue are under construction.
BRT systems in Egypt 
 
City
 
System name
 
Operator
 
Began
 
Lines
 
Stations
 
Length
 
Notes/Description
 
Type
 
BRT certified
  
Cairo 
Cairo Bus Rapid Transit [ 3] Ministry of Transportation
 
3 July 2025
 
1
 
14
 
35 km (22 mi)
 
Ring Road with the Alexandria Agricultural Road to the Police Academy station. 1 June 2025 (trial operation)[ 4]  
eBRT electric buses 
 
Not BRT certified in 2022.[ 2]   
BRT systems in Ghana 
 
City
 
System name
 
Began
 
Lines
 
Stations
 
Length
 
Notes/Description
 
Type
 
BRT certified
  
Accra 
Aayalolo 
25 November 2016
 
1
 
27
 
22 km (14 mi)
 
It was initially planned as a bus transit system with dedicated lanes, but because these lanes  were not provided  it was renamed Quality Bus System (QBS).[ 5]  
 
Not BRT certified in 2022.[ 2]   
In the following table, BRT systems in light blue are under construction.
BRT systems in Kenya 
 
City
 
System name
 
Operator
 
Began
 
Lines
 
Stations
 
Length
 
Notes/Description
 
Type
 
BRT certified
  
Nairobi 
MRTS BRT 
Namata[ 7]  
July 2022
 
1
 
-
 
20 km (12 mi)
 
 
 
Not BRT certified in 2024.[ 2]   
In the following table, BRT systems in light blue are under construction.
In the following table, BRT systems in light blue are under construction.
BRT systems in Mozambique 
 
City
 
System name
 
Began
 
Lines
 
Stations
 
Length
 
Notes/Description
 
Type
 
BRT certified
  
Maputo 
Maputo BRT
 
-
 
-
 
-
 
-
 
Under construction[ 9]  
 
Not BRT certified in 2024.[ 2]   
BRT systems in Nigeria 
 
City
 
System name
 
Region
 
Began
 
Lines
 
Stations
 
Length
 
Notes/Description
 
Type
 
BRT certified
  
Lagos 
Lagos BRT 
Lagos Metropolitan Area Transport Authority  (LAMATA)
17 March 2008
 
1
 
28
 
22 km (14 mi)
 
The Lagos Metropolitan Area Transport Authority LAMATA BRT corridor is about 22 kilometres long.[ 10] [citation needed  
The Nigerian government is building a BRT system for the Lagos Metropolitan Area, and the project's first phase has been completed.[ 11] 
 
 
Not BRT certified in 2016.[ 2]   
Oshodi - Abule-Egba BRT Lane 
Abule Egba 
-
 
-
 
-
 
13.65 km (8.48 mi)
 
The first phase cost N4.5 billion (about US$35 million). 
 
Not BRT certified in 2016.[ 2]   
In the following table, BRT systems in light blue are under construction.
BRT systems in Rwanda 
 
City
 
System name
 
Began
 
Lines
 
Stations
 
Length
 
Notes/Description
 
Type
 
BRT certified
  
Kigali 
-
 
-
 
-
 
-
 
-
 
Under construction[ 12]  
 
Not BRT certified in 2024.[ 2]   
BRT systems in Senegal 
 
City
 
System name
 
Began
 
Lines
 
Stations
 
Length
 
Notes/Description
 
Type
 
BRT certified
  
Dakar 
Sunu BRT [ 13] 14 January 2024
 
2
 
23
 
18.3 km (11.4 mi)
 
The Dakar , ongoing construction since 2019, delivery planned by the end of 2023. It will work together with the Train Express Regional Dakar-AIBD  to improve the public transportation system around and in Dakar.
 
eBRT electric buses 
 
Not BRT certified in 2022.[ 2]   
MyCiTi bus in the Foreshore , Cape Town  In the following table, BRT systems in light blue are under construction.
BRT systems in South Africa 
 
City
 
System name
 
Region
 
Began
 
Lines
 
Stations
 
Length
 
Notes/Description
 
Type
 
BRT certified
  
Cape Town 
MyCiTi 
City of Cape Town 
May 2010
 
36
 
42
 
120 km (75 mi)
 
MyCiTi system began operations in May 2010, just before the World Cup . Its first service was a shuttle from the airport to the central business district . The initial Phase 1A trunk and feeder services began operation in May 2011. The remaining Phase 1A construction was completed in 2014, and phase 1B construction was completed in 2015.[ 14]  
 
Bronze BRT certified (2013) .[ 2]  
George 
Go George BRT [ 15] Garden Route District Municipality 
August 2015
 
-
 
-
 
-
 
 
 
Not BRT certified in 2022.[ 2]   
Johannesburg 
Rea Vaya 
City of Johannesburg 
30 August 2009
 
-
 
-
 
25.5 km (15.8 mi)
 
Rea Vaya ("We're moving") line opened its first phase (Phase 1A ) to the public on 30 August 2009, and BRT expansion is under construction; stations and roadworks are mainly completed or are in the final stages. The system was partially opened for the 2010 World Cup, with the full system linking most of Johannesburg from Soweto  in the south to beyond Sandton  in the north. Buses include those able to use the BRT stations and general bus stops, to be feeders for the network; others are articulated, and can only use BRT stations.[ 16] [ 17]  
 
Silver BRT certified (2013) .[ 2]  
-
 
-
 
-
 
16.7 km (10.4 mi)
 
The 120-km Phase 1 route includes 150 stations, eight terminals, and six depots. Phase 1A, consisting of a 40-km route with 48 stations, was completed in April 2009 (before the FIFA Confederations Cup); Phase 1B  added 86 km and 102 stations to the system before the 2010 World Cup. According to the city's website, the system is fully integrated with other transport networks. Rea Vaya will not compete with other transport systems, such as the South African Rail Commuter Corporation or the Gautrain.[ 18] Phase 1C  route will connect downtown Johannesburg with Sandton[ 19]  
 
Bronze BRT certified (2014) .[ 2]  
Harambee BRT [ 20] City of Ekurhuleni 
October 2017
 
-
 
-
 
-
 
 
 
Not BRT certified in 2022.[ 2]   
Gqeberha 
Libhongolethu IPTS [ 21] Nelson Mandela Bay 
2010
 
-
 
-
 
-
 
A BRT system was implemented by Libhongolethu IPTS in the city for the 2010 World Cup.[ 22]  
 
Not BRT certified in 2013.[ 2]   
Pretoria 
A Re Yeng BRT [ 23] City of Tshwane 
December 2014
 
7
 
12
 
14 km (8.7 mi)
 
The City of Tshwane, Construction began in July 2012,[ 24] [ 25]  
 
Not BRT certified in 2015.[ 2]   
Rustenburg 
Yarona BRT [ 26] Bojanala Platinum District Municipality 
September 2022
 
-
 
-
 
-
 
 
 
Not BRT certified in 2022.[ 2]   
Polokwane 
Leeto La Polokwane BRT [ 27] Polokwane Local Municipality 
March 2021
 
-
 
-
 
-
 
 
 
Not BRT certified in 2022.[ 2]   
Durban 
GO Durban BRT [ 28] eThekwini Metropolitan Municipality 
-
 
-
 
-
 
-
 
 
 
Not BRT certified in 2024.[ 2]   
Bloemfontein 
Hauweng IPTN [ 29] Mangaung Metropolitan Municipality 
14 July 2024
 
3
 
-
 
-
 
 
 
Not BRT certified in 2024.[ 2]   
BRT bus in Dar es Salaam  
BRT systems in Tanzania 
 
City
 
System name
 
Operator
 
Began
 
Lines
 
Stations
 
Length
 
Notes/Description
 
Type
 
BRT certified
  
Dar es Salaam 
UDART 
UDA-RT
 
10 May 2016
 
1
 
29
 
21.1 km (13.1 mi)
 
The Construction of the first phase was completed in December 2015 at a total cost of €134 million funded by the African Development Bank, World Bank and the Government of Tanzania.[ 30]  
 
Not BRT certified in 2022.[ 2]   
In the following table, BRT systems in light blue are under construction.
BRT systems in Tunisia 
 
City
 
System name
 
Operator
 
Began
 
Lines
 
Stations
 
Length
 
Notes/Description
 
Type
 
BRT certified
  
Sfax 
-
 
-
 
-
 
-
 
-
 
-
 
Under construction[ 31]  
 
Not BRT certified in 2024.[ 2]   
In the following table, BRT systems in light blue are under construction.
BRT systems in Uganda 
 
City
 
System name
 
Began
 
Lines
 
Stations
 
Length
 
Notes/Description
 
Type
 
BRT certified
  
Kampala 
Greater Kampala BRT
 
-
 
-
 
-
 
-
 
Under construction[ 32]  
 
  
BRT systems in Afghanistan 
 
City
 
System name
 
Began
 
Lines
 
Stations
 
Length
 
Notes/Description
 
Type
 
BRT certified
  
Kabul 
Kabul BRT  (Metrobus)
July 2018
 
4
 
-
 
111 km (69 mi)
 
 
 
Not BRT certified in 2022.[ 2]   
Baku Bus in Baku  
BRT systems in Azerbaijan 
 
City
 
System name
 
Operator
 
Began
 
Lines
 
Stations
 
Length
 
Notes/Description
 
Type
 
BRT certified
  
Baku 
BakuBus 
BakuBus LLC
 
3 April 2014
 
5
 
-
 
-
 
 
 
Not BRT certified in 2022.[ 2]   
BRT systems in Bangladesh 
 
City
 
System name
 
Operator
 
Began
 
Lines
 
Stations
 
Length
 
Notes/Description
 
Type
 
BRT certified
  
Dhaka 
Dhaka BRT 
Dhaka Bus Rapid Transit Company Limited
 
2017
 
3
 
25
 
41 km (25 mi)
 
 
 
Not BRT certified in 2022.[ 2]   
		
			
			Guangzhou BRT
		 
		
			
			Beijing  BRT Line 1; the doors are on the left side because the line uses center-island platforms on most of its route.
 
		
			
			Xiamen BRT
		 
 
More than 30 projects are being implemented or studied in China 's large cities. In the following table, BRT systems in light blue are under construction. Kunming  developed the country's first BRT system in 1999.[ 33] 
^ Stations connected by transfers are counted as one station, unless otherwise noted. 
^ Corridor length; lines which sharing the same corridor are counted once. 
^ Portions (BRT 1 33.4 km, BRT 1 Interchange 18.7 km and BRT 2 15.3 km) are on dedicated, elevated roads. 
^ Portions (B7 Xierhuan corridor 7.1 km, Beiyuan Dajie 15.0 km, Erhuandonglu 8.0 km, Lishan Lu 4.8 km, Gongyebeilu-Aotizonglu Line 6 6.6 km) are on dedicated, six line on corridor. 
  
Government-designated BRT systems (BRTS) with segregated lanes:[ 54] 
In the following table, BRT systems in light blue are under construction.
BRT systems in Indonesia 
 
City
 
System name
 
Began
 
Lines
 
Stations [ c]  
Length [ d]  
Passengers (daily)
 
Notes/Description
 
Type
 
BRT certified
  
Bali 
Trans Metro Dewata  [id ] 
7 September 2020
 
5
 
-
 
-
 
-
 
Stopped operating 31 December 2024.
 
 
Not BRT certified in 2014.[ 2]   
Balikpapan 
Balikpapan City Transit  [id ] 
8 July 2024
 
3
 
-
 
-
 
-
 
 
 
Not BRT certified in 2024.[ 2]   
Banjarmasin metropolitan area 
BRT Banjarbakula  (Tayo bus)
14 August 2019
 
3
 
37
 
-
 
-
 
 
 
Not BRT certified in 2022.[ 2]   
Green Tayo 
1 February 2022
 
4
 
-
 
-
 
6,000
 
 
  
Trans Banjarmasin  [id ] 
17 February 2020
 
4
 
-
 
-
 
-
 
 
  
Banyumas Regency 
Trans Banyumas  [id ] 
5 December 2021
 
4
 
-
 
-
 
-
 
 
 
Not BRT certified in 2022.[ 2]   
Bekasi 
Our Trans Bekasi Patriot Bus  [id ] 
3 March 2024
 
1
 
47
 
-
 
-
 
 
 
Not BRT certified in 2024.[ 2]   
Our Trans Wibawa Mukti Bus  [id ] 
1 December 2024
 
1
 
58
 
-
 
-
 
 
  
Bogor 
Our Bus Trans Pakuan  [id ] 
2 December 2021
 
4
 
120
 
-
 
-
 
 
 
Not BRT certified in 2022.[ 2]   
Central Java 
Trans Central Java  [id ] 
7 July 2017
 
4
 
-
 
-
 
6,506,462
 
 
 
Not BRT certified in 2022.[ 2]   
Cirebon 
Trans Cirebon
 
-
 
-
 
-
 
-
 
-
 
 
 
  
Depok 
Our Bus Trans Depok  [id ] 
1 July 2024
 
1
 
50
 
-
 
-
 
 
 
Not BRT certified in 2024.[ 2]   
East Java 
Trans East Java  [id ] 
19 August 2022
 
5
 
-
 
75 km (47 mi)
 
-
 
 
 
Not BRT certified in 2022.[ 2]   
Jakarta 
Jakarta BRT 
15 January 2004
 
13
 
244
 
251.2 km (156.1 mi)
 
1,006,579
 
Transjakarta  is the longest BRT network in the world (251.2 km),[ 55] [ 56] right of way .[ 57] [ 55] [ 58] [ 56] eBRT electric buses 
 
Sliver BRT certified (2014) .[ 2]  
-
 
-
 
-
 
12.9 km (8.0 mi)
 
-
 
Transjakarta - Corridor 1
 
 
Bronze BRT certified (2013) .[ 2]  
Jayapura 
Trans Jayapura 
18 December 2019
 
4
 
4
 
-
 
-
 
 
 
Not BRT certified in 2022.[ 2]   
Batam 
Trans Metro Batam
 
24 September 2004
 
8
 
39
 
-
 
-
 
[ 59] 
 
Not BRT certified in 2014.[ 2]   
Yogyakarta 
Trans Jogja 
17 February 2008
 
11
 
267
 
-
 
20,000
 
[ 60] [ 61] 
 
Not BRT certified in 2014.[ 2]   
Pekanbaru 
Trans Metro Pekanbaru  [id ] 
18 June 2009
 
10
 
80
 
-
 
-
 
[ 62] 
 
Not BRT certified in 2014.[ 2]   
Bandung metropolitan area 
Trans Metro Bandung  [id ] 
23 September 2009
 
5
 
52
 
-
 
-
 
[ 63] 
 
Not BRT certified in 2014.[ 2]   
Metro Jabar Trans 
21 December 2021
 
5
 
-
 
-
 
-
 
[ 64] 
 
Not BRT certified in 2022.[ 2]   
Palembang 
Trans Musi Jaya  [id ] 
January 2010
 
6
 
129
 
156 km (97 mi)
 
22,000
 
[ 65] 
 
Not BRT certified in 2014.[ 2]   
Surakarta 
Batik Solo Trans 
1 September 2010
 
8
 
72
 
-
 
10,000
 
[ 66] [ 67] 
 
Not BRT certified in 2014.[ 2]   
Semarang 
Trans Semarang 
1 October 2010
 
8
 
35
 
-
 
33,000
 
[ 68] [ 69] [ 70] 
 
Not BRT certified in 2014.[ 2]   
Denpasar metropolitan area 
Trans Sarbagita 
18 August 2011
 
4
 
31
 
42 km (26 mi)
 
5,000
 
[ 71] [ 72] 
 
Not BRT certified in 2014.[ 2]   
Bandar Lampung 
Trans Lampung  [id ] 
14 November 2011
 
3
 
30
 
-
 
-
 
[ 73] 
 
Not BRT certified in 2014.[ 2]   
Padang 
Trans Padang  [id ] 
January 2014
 
2
 
26
 
42 km (26 mi)
 
10,000
 
[ 74] [ 75] [ 76] 
 
Not BRT certified in 2014.[ 2]   
Palangka Raya 
Trans Palangka Raya 
2 February 2018
 
5
 
26
 
-
 
-
 
 
 
Not BRT certified in 2022.[ 2]   
Palu 
Trans Palu  [id ] 
1 October 2024
 
4
 
-
 
-
 
-
 
 
 
Not BRT certified in 2024.[ 2]   
Pontianak 
Trans Pontianak Equator  [id ] 
3 February 2017
 
1
 
-
 
-
 
-
 
 
 
Not BRT certified in 2022.[ 2]   
Makassar metropolitan area 
Trans Mamminasata  [id ] 
March 2014
 
11
 
154
 
-
 
-
 
[ 77] 
 
Not BRT certified in 2014.[ 2]   
Banda Aceh 
Trans Koetaradja  [id ] 
2 May 2016
 
5
 
90
 
-
 
15,342
 
[ 78] [ 79] 
 
Not BRT certified in 2022.[ 2]   
Surabaya metropolitan area 
Suroboyo Bus 
7 April 2018
 
9
 
-
 
-
 
4,432
 
 
 
Not BRT certified in 2022.[ 2]   
Trans Semanggi Suroboyo 
29 December 2021
 
2
 
-
 
-
 
-
 
[ 80] 
 
Not BRT certified in 2022.[ 2]   
Medan metropolitan area 
Trans Mebidang  [id ] 
2015
 
2
 
-
 
55 km (34 mi)
 
-
 
 
 
Not BRT certified in 2016.[ 2]   
Trans Metro Deli  [id ] 
22 November 2020
 
5
 
-
 
-
 
-
 
 
 
Not BRT certified in 2022.[ 2]   
Bus Listrik Medan  [id ] 
4 January 2024
 
5
 
31
 
10.5 km (6.5 mi)
 
-
 
 
eBRT electric buses 
 
Not BRT certified in 2024.[ 2]   
BRT systems in Iran 
 
City
 
System name
 
Began
 
Lines
 
Stations
 
Length
 
Notes/Description
 
Type
 
BRT certified
  
Tehran Tehran BRT 2008 
10 
- 
179 km (111 mi) 
Not BRT certified in 2022.[ 2]   
Tabriz Tabriz BRT 
2009 
2 
- 
18 km (11 mi) 
  
Shiraz Shiraz BRT 
- 
4 
- 
- 
  
Isfahan Isfahan BRT 2013 
3 
33 
17 km (11 mi) 
  
Kerman Kerman BRT 
- 
2 
- 
- 
  
Mashhad Mashad BRT 
- 
5 
- 
- 
  
Karaj Karaj BRT 
- 
1 
- 
- 
  
Israel Haifa Metronit  bus 
BRT systems in Israel 
 
City
 
System name
 
Operator
 
Began
 
Lines
 
Stations
 
Length
 
Notes/Description
 
Type
 
BRT certified
  
Haifa Metronit Superbus August 2013 
5 
152 
60 km (37 mi) 
Not BRT certified in 2022.[ 2]   
Jerusalem Egged Transportation - 
- 
6 
- 
- 
Six lines 71, 72, 74, 75, 77, 78 
Not BRT certified in 2022.[ 2]   
Ashdod - 
- 
- 
2 
- 
- 
Two lines 1, 10 
Not BRT certified in 2022.[ 2]   
Yutorīto Line in Nagoya  
Amman BRT in Amman  
BRT systems in Jordan 
 
City
 
System name
 
Operator
 
Began
 
Lines
 
Stations
 
Length
 
Notes/Description
 
Type
 
BRT certified
  
Amman 
Amman Bus Rapid Transit 
Gursel - CMTC
 
27 July 2021
 
2
 
34
 
25 km (16 mi)
 
Amman Bus Rapid Transit began operation partially in 2021. Phase one has three routes: Route 98, Route 99, and Route 100. Phase two is expected to begin operation in 2022.
 
 
Not BRT certified in 2024.[ 2]   
Zarqa 
Amman-Zarqa Bus Rapid Transit 
-
 
15 May 2024
 
1
 
6
 
20 km (12 mi)
 
 
 
Not BRT certified in 2024.[ 2]   
In the following table, BRT systems in light blue are under construction.
BRT systems in Kazakhstan 
 
City
 
System name
 
Operator
 
Began
 
Lines
 
Stations
 
Length
 
Notes/Description
 
Type
 
BRT certified
  
Almaty 
Almaty BRT
 
-
 
-
 
-
 
-
 
102 km (63 mi)
 
Almaty Bus Rapid Transit project started in 2014, now operational, 102 km under construction or approved.[ 81]  
 
  
In the following table, BRT systems in light blue are under construction.
BRT systems in Laos 
 
City
 
System name
 
Operator
 
Began
 
Lines
 
Stations
 
Length
 
Notes/Description
 
Type
 
BRT certified
  
Vientiane 
-
 
-
 
-
 
-
 
-
 
-
 
Under construction[ 82]  
 
  
In the following table, BRT systems in light blue are under construction.
BRT systems in Lebanon 
 
City
 
System name
 
Operator
 
Began
 
Lines
 
Stations
 
Length
 
Notes/Description
 
Type
 
BRT certified
  
Beirut 
-
 
-
 
-
 
-
 
-
 
-
 
Under construction[ 83]  
 
  
RapidKL  BYD K9  electric bus on an elevated guideway, separate from road traffic
BRT systems in Myanmar 
 
City
 
System name
 
Operator
 
Began
 
Lines
 
Stations
 
Length
 
Notes/Description
 
Type
 
BRT certified
  
Yangon 
Yangon BRT 
-
 
9 February 2016
 
2
 
22
 
-
 
The BRT line consists of two line yellow line and blue line connecting to Pyay Rd and Insein Road to central town of Yangon.[ 84]  
 
Not BRT certified in 2022.[ 2]   
Rawalpindi-Islamabad Metrobus in Islamabad  TransPeshawar  Buses EDSA Carousel bus in Caloocan  In the following table, BRT systems in light blue are under construction.
BRT systems in Saudi Arabia 
 
City
 
System name
 
Began
 
Lines
 
Stations
 
Length
 
Notes/Description
 
Type
 
BRT certified
  
Riyadh 
Riyadh Bus 
19 March 2023
 
3
 
2,900
 
1,905 km (1,184 mi)
 
 
 
Not BRT certified in 2022.[ 2]   
Sejong  BRT bus near Government ComplexCenter-running bus lane and platform in Taipei  Chiayi  BRT
BRT systems in Taiwan 
 
City
 
System name
 
Operator
 
Began
 
Closed
 
Lines
 
Stations
 
Length
 
Notes/Description
 
Type
 
BRT certified
  
Taipei 
Taipei Joint Bus System 
15 Civil operation bus transports
 
1997
 
-
 
16
 
-
 
60 km (37 mi)
 
Dedicated bus lanes, constructed starting in 1996, which include many BRT features, such as raised station platforms.They are used by the Taipei Joint Bus System, including a system of 16 trunk lines  that aim to provide "MRT-like" service along arterial roads, with peak headways of four to six minutes.
 
 
Not BRT certified in 2014.[ 2]   
Chiayi City 
Chiayi Bus Rapid Transit 
Chiayi Bus Company
 
2008
 
-
 
3
 
18
 
29.7 km (18.5 mi)
 
Two routes: 7211 (between Chiayi  City Centre and Puzi ) and 7212, between the Chiayi TRA station  and the Chiayi HSR station .
 
 
Not BRT certified in 2014.[ 2]   
Taichung 
Taichung BRT 
-
 
28 July 2014
 
8 July 2015
 
1
 
21
 
17.1 km (10.6 mi)
 
"Optimized Bus Lane" It is still using most of the facilities built in BRT era; only the priority bus signals were cancelled.[ 103]  
 
Not BRT certified in 2014.[ 2]   
Bangkok  BRT
BRT systems in Thailand 
 
City
 
System name
 
Operator
 
Began
 
Lines
 
Stations
 
Length
 
Notes/Description
 
Type
 
BRT certified
  
Bangkok 
Bangkok BRT 
Bangkok Mass Transit System Public Company Limited 
23 May 2010
 
5
 
14
 
16.5 km (10.3 mi)
 
The route begins at Sathon and runs along Narathiwat Ratchanakharin Road, turns right at Rama III Road, crosses the Chao Phraya River on the Rama III Bridge and follows Ratchadaphisek Road before turning right at Ratchahruek Road. At the Sathon-Narathiwat Ratchanakharin intersection, a walkway connects BRT Sathon and the BTS Chong Nonsi station .
 
 
Bronze BRT certified (2014) .[ 2]  
Metrobus-Topkapi in Istanbul  
BRT systems in Turkey 
 
City
 
System name
 
Operator
 
Began
 
Lines
 
Stations
 
Length
 
Notes/Description
 
Type
 
BRT certified
  
Istanbul 
Metrobus 
İETT 
17 September 2007
 
1
 
44
 
52 km (32 mi)
 
Tuyap and Söğütlüçeşme, is Turkey first full-service bus rapid transit system. It has a fully separated right-of-way (except crossing the Bosphorus Bridge ) and off-bus fare collection.
 
 
Silver BRT certified (2014) .[ 2]  
Malatya 
Malatya Trambus  [tr ] 
Motas
 
10 March 2015
 
-
 
53
 
20 km (12 mi)
 
Trambus is a mixed-traffic BRT system with bi-articulated trolleybuses.
 
eBRT trolleybuses 
 
Not BRT certified in 2022.[ 2]   
Urfa  (Sanliurfa)
Trambus (Sanliurfa)  [tr ] 
-
 
28 April 2023
 
1
 
63
 
7.7 km (4.8 mi)
 
Sanliurfa city implemented trolleybus on bus rapid transit.
 
eBRT trolleybuses 
 
Not BRT certified in 2024.[ 2]   
United Arab Emirates [ edit ] In the following table, BRT systems in light blue are under construction.
Hanoi  BRT 01 (Line 99) bus at the Kim Ma terminal
BRT systems in Vietnam 
 
City
 
System name
 
Began
 
Lines
 
Stations
 
Length
 
Notes/Description
 
Type
 
BRT certified
  
Hanoi 
Hanoi BRT 
31 December 2016
 
5
 
-
 
14.5 km (9.0 mi)
 
System runs from the downtown Kim Mã terminal to the Yên Nghĩa terminal in Hanoi's southern suburbs.The system is a component of the Hanoi Urban Transport Development Project, which was approved by the Hanoi People's Committee in Decision 1837/QĐ-UBND on May 10, 2007. The World Bank-funded ODA  project is a step in improving the city's urban transport network and increasing public-transport capacity.
 
 
Not BRT certified in 2022.[ 2]   
In the following table, BRT systems in light blue are under construction.
BRT systems in Austria 
 
City
 
System name
 
Operator
 
Began
 
Lines
 
Stations
 
Length
 
Notes/Description
 
Type
 
BRT certified
  
Vienna 
-
 
-
 
-
 
-
 
-
 
-
 
Entire bus system includes many BRT features such as stop distancing, place name signs on all bus stop signs, all door boarding and an entirely proof of payment, off-board fare collection system.
 
 
Not BRT certified in 2022.[ 2]   
BRT systems in Denmark 
 
City
 
System name
 
Operator
 
Began
 
Lines
 
Stations
 
Length
 
Notes/Description
 
Type
 
BRT certified
  
Aalborg 
Plusbus (da  
 
-
 
23 September 2023
 
2
 
22
 
12 km (7.5 mi)
 
Launch it first "Plusbus" BRT in the city. It is a 12 km route from the eastern to the western most part of the city; 1 km yet to be finalized.[ 105] [ 106] [ 107]  
eBRT electric buses 
 
Not BRT certified in 2022.[ 2]   
Runkolinja Rastila in Helsinki  In the following table, BRT systems in light blue are under construction.
Évéole bus in Douai  Bus à haut niveau de service (BHNS) in French - High-level bus service in English[ 109] 
In the following table, BRT systems in light blue are under construction.
BRT systems in France 
 
City
 
System name
 
French name
 
Began
 
Lines
 
Stations
 
Length
 
Notes/Description
 
Type
 
BRT certified
  
Aix-en-Provence 
BHNS Aixpress  [fr ] 
BHNS Aixpress
 
2 September 2019
 
6
 
19
 
7.2 km (4.5 mi)
 
 
eBRT electric buses 
 
Not BRT certified in 2022.[ 2]   
Antibes 
Envibus Line A  [fr ] 
BHNS Antibes
 
6 January 2020
 
76
 
35
 
-
 
 
  
Amiens 
Ametis Nemo 1  [fr ] 
BHNS Amiens
 
11 May 2019
 
4
 
37
 
15.7 km (9.8 mi)
 
 
eBRT electric buses 
  
Angoulême 
Réseau Möbius  [fr ] 
BHNS Angoulême
 
2 September 2019
 
49
 
-
 
20 km (12 mi)
 
 
  
Annemasse 
TAC Tango  [fr ] 
BHNS Annemasse
 
15 December 2019
 
8
 
14
 
7.5 km (4.7 mi)
 
 
  
Avignon 
Chrono'hop  [fr ] 
BHNS Chrono'hop
 
19 October 2019
 
2
 
56
 
25 km (16 mi)
 
 
  
Bayonne 
Tram Bus Line T1  [fr ] 
BHNS Bayonne
 
2 September 2019
 
3
 
33
 
-
 
 
eBRT electric buses 
  
Belfort 
BHNS Optymo  [fr ] 
BHNS Optymo phase II
 
26 August 2013
 
5
 
15
 
7.6 km (4.7 mi)
 
 
  
Besançon 
Besançon BRT  [fr ] 
BHNS Besançon
 
2 September 2017
 
1
 
-
 
4.1 km (2.5 mi)
 
Route of line 3
 
  
Bordeaux 
Bordeaux express bus line G 
BHNS Bordeaux
 
2024
 
1
 
42
 
21 km (13 mi)
 
Under construction
 
 
  
Brest 
Brest BRT  [fr ] 
Brest BHNS
 
-
 
-
 
-
 
-
 
Line D under construction
 
 
  
Cannes 
Le Palm Bus Express BRT 
BHNS Cannes
 
2013
 
2
 
25
 
11 km (6.8 mi)
 
 
 
Not BRT certified in 2022.[ 2]   
Chalon-sur-Saône 
BRT Flash
 
BHNS Chalon-sur-Saône
 
2012
 
1
 
15
 
6 km (3.7 mi)
 
 
 
Not BRT certified in 2022.[ 2]   
Clermont-Ferrand 
Line B of the Clermont-Ferrand T2C network  [fr ] 
Clermont-Ferrand BHNS
 
8 December 2012
 
-
 
-
 
5.8 km (3.6 mi)
 
Line B of the Clermont-Ferrand BHNS, Lines B (Royat  to Stade Marcel Michelin)
 
 
Not BRT certified in 2022.[ 2]   
Line C of the Clermont-Ferrand BHNS  [fr ] 
13 January 2014
 
-
 
-
 
17.5 km (10.9 mi)
 
Line C of the Clermont-Ferrand BHNS, Lines C (Tamaris to Cournon-d'Auvergne ) [ 110]   
Dijon 
Divia Mobilitès  [fr ] 
BHNS Dijon
 
25 October 2004
 
36
 
1090
 
-
 
 
 
Not BRT certified in 2022.[ 2]   
Douai 
Évéole  [fr ] 
BHNS Douai
 
8 February 2010
 
1
 
37
 
34 km (21 mi)
 
Évéole is the public transport network used guided busway APTS Phileas  [fr ] [ 111]  
 
Not BRT certified in 2022.[ 2]   
Douai High-Level Service Bus  [fr ]  (Évéa)
18.7 km (11.6 mi)
 
  
Évry 
TICE  [fr ] 
BHNS TICE
 
31 December 2023
 
25
 
31
 
18 km (11 mi)
 
TICE has a segregated, elevated system. France 's first line (1975).[ 112]  
 
Not BRT certified in 2022.[ 2]   
La Rochelle 
ILLICO BRT Line  [fr ]  (Yélo Network)
BHNS La Rochelle
 
2009
 
1
 
2
 
6 km (3.7 mi)
 
 
 
Not BRT certified in 2022.[ 2]   
Le Mans 
Line T3 of the BHNS of Le Mans  [fr ] (SETRAM)
BHNS Le Mans
 
20 February 2016
 
1
 
12
 
7.2 km (4.5 mi)
 
Line T3 of the BHNS of Le Mans
 
 
Not BRT certified in 2022.[ 2]   
Lille 
Lille Metropole Lianas  [fr ] 
BHNS Lille
 
28 January 2008
 
13
 
121
 
67 km (42 mi)
 
 
 
Not BRT certified in 2022.[ 2]   
Lens  and Béthune 
Tadao 
BHNS Lens
 
2003
 
67
 
-
 
-
 
Bubble Lines
 
 
Not BRT certified in 2022.[ 2]   
Lorient 
BRT Triskell BHLS  [fr ] 
BHNS Lorient
 
2007
 
6
 
43
 
14 km (8.7 mi)
 
 
 
Not BRT certified in 2022.[ 2]   
Lyon 
Lyon trolleybus line C1  [fr ] 
BHNS Lyon
 
12 October 2006
 
2
 
7
 
8.4 km (5.2 mi)
 
Trolleybuses in Lyon  (Line C1 and C2 and C3)
eBRT trolleybuses 
 
Not BRT certified in 2022.[ 2]   
Lyon trolleybus line C2  [fr ] 
29 August 2011
 
4
 
10
 
12.1 km (7.5 mi)
  
Lyon trolleybus line C3  [fr ] 
30 October 2007
 
3
 
17
 
12 km (7.5 mi)
  
Marseille 
Marseille RTM  [fr ] 
BHNS de Lille
 
-
 
5
 
-
 
-
 
Très Grands Bus (TGB lines)
 
 
Not BRT certified in 2022.[ 2]   
Maubeuge 
BHLS - Viavil
 
-
 
2008
 
1
 
14
 
8.4 km (5.2 mi)
 
Busway lines of the du Stibus network
 
 
Not BRT certified in 2022.[ 2]   
Metz 
BRT Mettis  [fr ] 
BHNS Mettis
 
5 October 2013
 
2
 
47
 
17.8 km (11.1 mi)
 
A and B Line
 
 
Not BRT certified in 2022.[ 2]   
Line A of the Mettis of Metz  [fr ] 
2
 
26
 
12.5 km (7.8 mi)
 
 
  
Line B of the Mettis de Metz  [fr ] 
3
 
22
 
11 km (6.8 mi)
 
 
  
Line C of the Mettis of Metz  [fr ] 
-
 
3
 
21
 
10 km (6.2 mi)
 
Under Construction still 2027
 
  
Montpellier 
Bustram of Montpellier  [fr ] 
BHNS Montpellier
 
23 May 2025
 
5
 
105
 
57 km (35 mi)
 
 
 
Not BRT certified in 2025.[ 2]   
Mulhouse 
BRT Mulhouse  [fr ] 
BHNS Mulhouse
 
2 September 2013
 
1
 
16
 
8.7 km (5.4 mi)
 
 
 
Not BRT certified in 2022.[ 2]   
Nancy 
Trolleybuses in Nancy 
BHNS Nancy
 
5 April 2025
 
1
 
25
 
10 km (6.2 mi)
 
Trolleybuses Line T1: Essey-lès-Nancy , Mouzimpré to Vandœuvre , Brabois-Hôpitaux
 
eBRT trolleybuses 
 
Not BRT certified in 2025.[ 2]   
BRT Tempo Lines  [fr ] 
BHNS Nancy
 
24 August 2013
 
3
 
128
 
45.6 km (28.3 mi)
 
Tempo Line T2: Laneuveville-devant-Nancy  Centre to Laxou Sapinière,
Line T3: Seichamps  Haie Cerlin to Villers  Campus Sciences,
Line T4: Houdemont  Porte Sud to reach Laxou  Champ-le-Bœuf.
 
 
Not BRT certified in 2022.[ 2]   
Nantes 
Nantes Busway 
BHNS Nantes
 
6 November 2006
 
2
 
30
 
13 km (8.1 mi)
 
 
eBRT electric buses 
 
Bronze BRT certified (2013). [ 2]  
Nîmes 
BRT Tango+  [fr ] 
BHNS Tango+
 
29 September 2012
 
1
 
9
 
7.2 km (4.5 mi)
 
Line T1 and line T2
 
 
Not BRT certified in 2022.[ 2]   
Paris , Île-de-France 
Trans-Val-de-Marne  (TVM)
-
 
1 October 1993
 
2
 
32
 
19 km (12 mi)
 
Operated by RATP . It was the second BRT system implemented in France during the 1980s; for political reasons, there are no bus lanes through Saint-Maur-des-Fossés .
 
 
BRT certified with Silver Excellence (2014) .[ 2]  
RATP bus line 393  [fr ] 
-
 
10 September 2011
 
1
 
10
 
11 km (6.8 mi)
 
Créteil  393 is also operated by RATP. Shares bus lane and stations with TVM for five kilometres.
 
Not BRT certified in 2022.[ 2]   
T Zen 
BHNS T Zen
 
4 July 2011
 
1
 
14
 
14.7 km (9.1 mi)
 
Tzen 1
 
 
Not BRT certified in 2022.[ 2]   
Pau 
BRT FÉBUS  [fr ] 
BHNS FÉBUS
 
8 July 2019
 
1
 
14
 
6 km (3.7 mi)
 
 
 
Not BRT certified in 2022.[ 2]   
Rennes 
BRT Rennes Trambus  [fr ] 
BHNS Rennes
 
-
 
4
 
100
 
55 km (34 mi)
 
Under construction
 
 
Not BRT certified in 2022.[ 2]   
Rouen 
TEOR 
-
 
12 February 2001
 
4
 
65
 
39 km (24 mi)
 
T1, T2, T3 lines
 
 
Silver BRT certified (2013) .[ 2]  
Saint-Nazaire 
BRT Helyce  [fr ] 
BHNS Hélyce
 
3 September 2012
 
2
 
20
 
9 km (5.6 mi)
 
 
 
Not BRT certified in 2022.[ 2]   
Sophia Antipolis 
BRT TEO  [fr ] 
BHNS Saint-Brieuc
 
-
 
-
 
-
 
8 km (5.0 mi)
 
Bus-Tram
 
 
Not BRT certified in 2022.[ 2]   
Strasbourg 
Line G of the Strasbourg BHNS  [fr ] 
Strasbourg BHNS
 
30 November 2013
 
2
 
34
 
13.2 km (8.2 mi)
 
Line G of the Strasbourg BHNS (Gare Centrale–Espace Européen de l'Entreprise)
 
 
Not BRT certified in 2022.[ 2]   
Line H of the Strasbourg BHNS  [fr ] 
24 February 2020
 
2
 
10
 
3.2 km (2.0 mi)
 
  
Toulouse 
Linéo  [fr ] 
BHNS Toulouse
 
2008
 
2
 
17
 
11 km (6.8 mi)
 
 
 
Not BRT certified in 2022.[ 2]   
Tours 
Line 2 Tempo  [fr ] 
BHNS Tours
 
31 August 2013
 
2
 
35
 
15.9 km (9.9 mi)
 
Line 2 Tempo
 
 
Not BRT certified in 2022.[ 2]   
In the following table, BRT systems in light blue are under construction.
BRT systems in Greece 
 
City
 
System name
 
Operator
 
Began
 
Lines
 
Stations
 
Length
 
Notes/Description
 
Type
 
BRT certified
  
Athens 
 
-
 
-
 
-
 
-
 
-
 
Thermal Bus Company
 
 
Not BRT certified in 2024.[ 2]   
Thessaloniki 
OASTH 
-
 
6 August 1957
 
85
 
4
 
-
 
 
 
Not BRT certified in 2014.[ 2]   
In the following table, BRT systems in light blue are under construction.
BRT systems in Iceland 
 
City
 
System name
 
Operator
 
Began
 
Lines
 
Stations
 
Length
 
Notes/Description
 
Type
 
BRT certified
  
Reykjavík 
Borgarlína 
-
 
-
 
-
 
-
 
-
 
Under construction until 2026[ 113]  
 
  
Van Hool ExquiCity 18 trolleybus in Rimini , Metromare  In the following table, BRT systems in light blue are under construction.
Zuidtangent  bus in Hoofddorp In the following table, BRT systems in light blue are under construction.
BRT systems in Norway 
 
City
 
System name
 
Operator
 
Began
 
Lines
 
Stations
 
Length
 
Notes/Description
 
Type
 
BRT certified
  
Stavanger/Sandnes 
Bussveien 
-
 
-
 
-
 
-
 
50 km (31 mi)
 
The bus rapid transit system planned to be the longest in Europe, 50 km, 80% dedicated right of way.[ 117]  
 
Not BRT certified in 2022.[ 2]   
In the following table, BRT systems in light blue are under construction.
BRT systems in Poland 
 
City
 
System name
 
Operator
 
Began
 
Lines
 
Stations
 
Length
 
Notes/Description
 
Type
 
BRT certified
  
Kraków 
-
 
-
 
-
 
-
 
-
 
-
 
There is a bus rapid transit system shared with trams, consisting of two sections, one at Monte Cassino Street and another one at Grzegórzki Street, Warsaw Uprisers' Avenue and in the north part of Old Town ring, as well as bus lanes on the Three Wisemen Avenues.
 
 
Not BRT certified in 2024.[ 2]   
Metrocarro Estacao Lousa, Metro Mondego Mobility System In the following table, BRT systems in light blue are under construction.
BRT systems in Portugal 
 
City
 
System name
 
Operator
 
Began
 
Lines
 
Stations
 
Length
 
Notes/Description
 
Type
 
BRT certified
  
Coimbra 
Mondego Mobility System  [pt ] 
Metro Mondego , SA
30 August 2025
 
3
 
42
 
42 km (26 mi)
 
Portugal's first Bus Rapid Transit system was announced in 2020 and is expected to launch by the end of 2025. With an extension of 42 km, 42 stations, 35 vehicles, and initially connecting 3 municipalities.[ 118]  
eBRT electric buses 
 
Not BRT certified in 2024.[ 2]   
Porto 
Metrobus line 1
 
Metro do Porto 
-
 
1
 
-
 
8 km (5.0 mi)
 
A Bus Rapid Transit System will be built between Boa Vista and Praça do Império. It will be 8 kilometres long and is scheduled to be completed by the last quarter of 2023.[ 119] [ 120]  
 
Not BRT certified in 2024.[ 2]   
Braga 
Braga BRT
 
-
 
-
 
-
 
-
 
-
 
Under construction, to be completed by 2026.
 
 
Not BRT certified in 2024.[ 2]   
Faro 
Algarve Metrobus 
-
 
-
 
1
 
24
 
34 km (21.1 mi)
 
A proposed 38 kilometre line that will that will connect the city of Faro  with the neighboring municipalities of Olhão  and Loulé . It will serve around 85,000 residents, costing €300-€510 million upon completion in 2029. (Under construction, to be completed by 2029)
 
 
Not BRT certified in 2024.[ 2]   
Unidad articulada del BEi TUVISA in Vitoria-Gasteiz  In the following table, BRT systems in light blue are under construction.
A modern bi-articulated bus in Malmö , Sweden  Van Hool Exqui.City 18 bus on route G2 in the Titanic Quarter, Belfast , N. Ireland In the following table, BRT systems in light blue are under construction.
BRT systems in United Kingdom 
 
City
 
System name
 
Operator
 
Began
 
Lines
 
Stations
 
Length
 
Notes/Description
 
Type
 
BRT certified
  
Belfast Glider  (EWAY )Translink September 2018 
- 
- 
24.5 km (15.2 mi) 
The bus rapid transit system operating on Service G1 serves east–west and service G2 serves Titanic Quarter . 
eBRT electric buses  
Not BRT certified in 2022.[ 2]   
Birmingham , West Midlands Sprint . Sprint Diamond West Midlands - 
7 
- 
- 
A limited stop service with dedicated bus lanes, with a total of 7 routes to be operational by 2026. (Under construction  until 2026)
  
Bradford Manchester Road Quality Bus Initiative Bradford end 
First West Yorkshire October 2001 
- 
- 
- 
1.4 miles (2.3 km) of guided busway and a further 0.6 miles (1 km) of unguided bus lanes on Manchester Road to the city centre. 
  
Bristol MetroBus First West of England 29 May 2018 
5 
- 
50 km (31 mi) 
The bus rapid transit network which is a section of guided busway in Ashton Gate  and a bus-only exit and bridge on the M32 motorway  
  
Cambridgeshire Guided Busway Stagecoach East  & Whippet 7 August 2011 
3 
8 
25 km (16 mi) 
The Busway runs north-west from Milton Road to St Ives  and south from the station to the Trumpington  park and ride . 
Bronze BRT certified (2013) .[ 2]  
Colchester Colchester BRT First Essex 2025 
1 
8 
8 km (5.0 mi) 
Not BRT certified in 2025.[ 2]   
Crawley Fastway BRT Metrobus October 2006 
3 
150 
24 km (15 mi) 
Route 10 connects Bewbush to Gatwick Airport, Route 20 links Broadfield to Horley, and Route 100 runs between Maidenbower and Redhill, all with stops in Crawley and Gatwick Airport 
Not BRT certified in 2022.[ 2]   
Hampshire South East Hampshire BRT (Eclipse) First Hampshire & Dorset 22 April 2012 
2 
7 
3.4 km (2.1 mi) 
Between Gosport  and Fareham . A 2.8-mile (4.5 km) bus-only road along the former Fareham–Gosport line  has been opened from Titchborne Way in Gosport to Redlands Lane in Fareham as phase one of a larger scheme. Operated by First Hampshire & Dorset as Eclipse. 
  
Ipswich 
Ipswich Rapid Transit Superroute 66 )
 
First Bus East of England 
1995
 
-
 
-
 
-
 
It is a 219 yards (200 m) guided busway section.
  
Kent  & Essex 
Fastrack 
Go-Ahead London  & Stagecoach South East 
26 March 2006
 
7
 
-
 
-
 
Unguided with sections of segregated running using standard buses and was re-opened on 17 November 2024
 
eBRT electric buses 
  
Leeds Leeds Superbus First West Yorkshire July 1998 
- 
- 
- 
Guided busway along York Road (the A64 ) 
  
Liverpool 
-
 
 Metro  (Merseytravel ; Operator TBC)
-
 
-
 
-
 
-
 
New rapid 'Glider' bus that will provide connections to Liverpool John Lennon Airport and the city's football stadiums by 2028. The 18-metre, articulated vehicle can transport around 30% more passengers than an average double decker bus. Under construction
 
eBRT electric buses 
  
London East London Transit Blue Triangle  & Go-Ahead London 20 February 2010 
- 
- 
Bus rapid transit system with three routes. 
  
Luton Luton to Dunstable Busway Arriva  & Centrebus  and Grant Palmer 24 September 2013 
- 
- 
4.8 km (3.0 mi) 
It runs between Luton Airport and Houghton Regis via Dunstable following the Dunstable branch line, which closed in 1989, running parallel to the A505 (Dunstable Road) and A5065 (Hatters Way).It runs for 6.1 miles, 4.8 mi are guided track with a maximum speed of 50 mph. The £91 million scheme. 
  
Greater Manchester Leigh-Salford-Manchester Bus Rapid Transit Go North West , Bee Network 3 April 2016 
2 
35 
22 km (14 mi) 
From Leigh  and Atherton  to Manchester via Tyldesley  and Ellenbrook . The 29-stop scheme totals 14 miles (22 km) and uses part of a former railway line  to form a 4 miles (7 km) guided busway with a pedestrian and cycle lane and bridleway. It then joins the East Lancashire Road  in a dedicated bus lane.[ 124]  
  
Gateshead , Newcastle upon Tyne  & Tyne and Wear Centrelink 
Go North East - 
- 
- 
- 
Was an infrastructure project including an exclusive busway for bendy bus services
  
Runcorn Runcorn Busway Arriva North West October 1971 
- 
38 
22 km (14 mi) 
It was the first BRT system in the world and runs for 22 kilometres (14 mi) in a figure of 8 across the town.[ 125] [ 126]  
  
Sheffield 
Bus Rapid Transit North 
First South Yorkshire 
4 September 2016
 
3
 
-
 
-
 
-
 
  
Swansea FTR Metro First Cymru September 2009 
1 
27 
13.5 km (8.4 mi) 
Partially segregated, specialised BRT vehicles, on-board payment to customer-care attendant, runs every 15 minutes from 7 am to 7 pm (a conventional bus at other times). 
  
The Ottawa  Transitway, one of North America's largest BRT systems R4 41st Ave  departing UBC YRT 's Viva  bus in York Region , north of Toronto In the following table, BRT systems in light blue are under construction.
BRT systems in Canada 
 
City
 
System name
 
Operator
 
Began
 
Lines
 
Stations
 
Length
 
Notes/Description
 
Type
 
BRT certified
  
Brampton Züm Brampton Transit 20 September 2010 
5 
- 
- 
Brampton Transit has a pay-on-board system, similar to its local Brampton Transit  counterpart.[ 127]  
Not BRT certified in 2014.[ 2]   
Calgary MAX Calgary Transit 19 November 2018 
4 
63 
56 km (35 mi) 
Calgary Transit, BRT System  make up their network of rapid transit along with their light rail. 
Not BRT certified in 2022.[ 2]   
Durham Region, Ontario  (suburban Toronto)DRT Pulse Durham Region Transit 29 June 2013 
4 
- 
- 
Not BRT certified in 2014.[ 2]   
Gatineau Rapibus Société de transport de l'Outaouais  (STO)2013 
7 
12 
12 km (7.5 mi) 
  
Halifax, Nova Scotia MetroLink Halifax Transit 21 August 2005 
- 
- 
- 
Halifax Transit was a BRT system with three routes linking Portland Hills, Woodside and Sackville and downtown Halifax. Fares were higher than the conventional Metro Transit. 
  
Kelowna 97X Kelowna RapidBus Kelowna Regional Transit System   (part of RapidBus is  BC Transit )September 2010 
- 
- 
- 
  
Kitchener , Waterloo Region, Ontario ION Grand River Transit  (GRT)- 
1 
- 
- 
Grand River Transit has two routes fairway station , (iXpress) express bus service and one of which (Route 200) has been converted to the ION  light rail and BRT service: Dedicated and separated lanes for high-frequency buses from Fairway Station to Downtown Cambridge.[ 128]  
Not BRT certified in 2025.[ 2]   
London, Ontario Rapid Transit London Transit - 
3 (including Downtown Loop) 
23 
15.8 km (9.8 mi) 
London Transit will make up their network of bus rapid transit once completed. The City of London, Ontario currently has Wellington Gateway and East London Link under construction as to otherwise the "Shift" corridors. 
  
Montreal Pie-IX BRT Société de transport de Montréal  (STM)7 November 2022 
- 
20 
13 km (8.1 mi) 
Montreal bus rapid transit, The SRB (Service rapide par bus ) Pie-IX is currently under construction on Pie-IX Boulevard, with dedicated right of way and station-like stops, including indoor transfer to a metro station also under construction. Other lines have preferential traffic signals and dedicated lanes.[ 129]  
Not BRT certified in 2022.[ 2]   
Mississauga Mississauga Transitway MiWay 17 November 2014 
1 
12 
18 km (11 mi) 
Not BRT certified in 2014.[ 2]   
Ottawa Transitway OC Transpo 1983 
12 
57 
59 km (37 mi) 
OC Transpo is one of North America's largest BRT systems, with over 200,000 passengers daily and peak capacities of 10,000 passengers per hour per direction. Most sections of the Transitway have a speed limit of 70–90 km/h (43–56 mph) between stations and 50 km/h (31 mph) in station areas. Many routes converge at the Transitway, providing frequent service. 
Bronze BRT certified (2013) .[ 2]  
Quebec City Metrobus (Quebec)  [fr ] RTC November 2019 
4 
189 
120 km (75 mi) 
Réseau de transport de la Capitale, Métrobus has four BRT routes throughout the city: routes 800, 801, 802, 803, 804 and 807 
Not BRT certified in 2022.[ 2]   
Saint John, New Brunswick Saint John Transit SJT - 
- 
- 
- 
Saint John Transit , three ComeX (Community Express) routes link Grand Bay-Westfield, Rothesay, Quispamsis and Hampton to uptown Saint John. The fare is higher than the conventional Saint John Transit.
  
Saskatoon Link (Saskatoon) Saskatoon Transit - 
- 
- 
- 
Saskatoon Transit had four DART (Direct Access Rapid Transit) routes which connected downtown Saskatoon, Confederation Mall , The Centre , the University of Saskatchewan , Lawson Heights Mall , University Heights Suburban Centre  and the Saskatchewan Polytechnical Institute  campus. The service was expanded to a greater set of suburban connector routes, but rebranded into STS 's regularly scheduled service. (e.g. 81, 82, 83, 84, and 86 serving outgoing routes, and are all consolidated as 8 when returning to the downtown terminal after serving their respective neighbourhoods.) 
  
Toronto York University Busway Toronto Transit Commission  (TTC)20 November 2009 
- 
- 
1.8 km (1.1 mi) 
Toronto Transit Commission (TTC) formerly operated the BRT route, 196 York University Rocket on the York University Busway. Although it has been successful, the TTC planned to close the BRT route once the extension to Line 1  of the Toronto subway  was completed.[ 130] [ 131]  
Not BRT certified in 2022.[ 2]   
Vancouver RapidBus (TransLink) TransLink 6 January 2020 
6 
75 
- 
TransLink started in 2020 as a successor to its B-Lines, with more passenger features and amenities. The 99 B-Line  is the last remaining B-Line route and has been successful, but TransLink estimates that its SkyTrain costs about $0.75 per ride compared to $1.04-$2.22 for its BRT routes. Two B-Line routes have been replaced by rapid-transit lines; the 98 B-Line  was replaced with the Canada Line  in 2009 and the 97 B-Line  by the Evergreen Extension  in 2016. Another two B-Lines, the 95 and 96, were replaced with RapidBus routes, the R5  and R1  respectively. Along with the two upgraded B-Lines, there are also three other RapidBus routes, R2 , the R3  and R4 . A sixth route, the R6 , is the most recent expansion, having opened in January 2024. 
  
Victoria, British Columbia Blink RapidBus Victoria Regional Transit System 10 April 2023 
- 
- 
- 
Victoria Regional Transit System  service started in 2023, providing faster and more frequent service on an existing bus corridor using bus priority lanes.[ 132]  
Not BRT certified in 2024.[ 2]   
Winnipeg Winnipeg RT Winnipeg Transit April 2012 
1 
16 
4 km (2.5 mi) 
Winnipeg Transit  operates similarly to Ottawa's, with dedicated lanes outside the downtown core and HOV  lanes within it. The first phase connects downtown with Fort Rouge, with current routes servicing the University of Manitoba  along Pembina Highway and a few suburban communities in the south-west. It will be eventually extended to Bison Drive.[ 133] Not BRT certified in 2014.[ 2]   
York Region, Ontario  (suburban Toronto)Viva Rapid Transit York Region Transit 4 September 2005 
4 
27 
31.9 km (19.8 mi) 
Viva Blue , began service in 2005. In response to escalating congestion on the region's roads, the region's transit plan included a provision for a BRT system along the Yonge Street and Highway 7 arterial corridors.[ 134] honor system  of fare payment.[ 135] Bronze BRT certified (2016) .[ 2]  
Transmetro  in Guatemala City
BRT systems in Guatemala 
 
City
 
System name
 
Operator
 
Began
 
Lines
 
Stations
 
Length
 
Notes/Description
 
Type
 
BRT certified
  
Guatemala City 
Transmetro 
Municipalidad de la Ciudad de Guatemala (Municipality of Guatemala City)
 
3 February 2007
 
7
 
107
 
24 km (15 mi)
 
Transmetro  has 7 lines and 107 stations, and 1 line with 14 stations under construction. The first line (Line 12), opened on February 3, 2007, and crosses Aguilar Batres Avenue from Villa Nueva to the city's downtown. The second line (Line 13) began operation on August 12, 2010, and crosses 6th and 7th Avenue in a one-way-per-avenue scheme. Lines 1, 2, 6, 7, and 18 have been added recently, and Line 5 is under construction. The line number represents the main zone each line serves (For example, most of Line 7 runs through Zone 7's neighborhoods, Line 1 runs through Zone 1, and so on).
 
Gold BRT certified (2014) .[ 2]  
-
 
-
 
-
 
11.7 km (7.3 mi)
 
Transmetro - Eje Central
 
 
Silver BRT certified (2014) .[ 2]  
Transurbano 
Sistema Integrado Guatemalteco de Autobuses (SIGA)
 
3 July 2010
 
41
 
400
 
-
 
 
 
Not BRT certified in 2014.[ 2]   
TuBus (YourBus)  [es ] 
Municipality of Guatemala City
 
6 July 2023
 
4
 
-
 
12 km (7.5 mi)
 
 
 
Not BRT certified in 2024.[ 2]   
Mixco 
Express Routes  [es ] 
Municipality of Mixco
 
25 February 2017
 
3
 
-
 
-
 
 
 
Not BRT certified in 2022.[ 2]   
Villa Nueva 
TransMIO  [es ] 
Municipality of Villa Nueva
 
20 December 2017
 
3
 
-
 
27 km (17 mi)
 
 
 
Not BRT certified in 2022.[ 2]   
Santa Catarina Pinula 
TransPinula 
Municipalidad de Santa Catarina Pinula (Santa Catarina Pinula Municipality)
 
29 January 2022
 
2
 
22
 
-
 
 
 
Not BRT certified in 2022.[ 2]   
Van Hool ExquiCity 24 n°5002 - FDF Almadies, Fort-de-France  in Martinique 
BRT systems in Martinique 
 
City
 
System name
 
Operator
 
Began
 
Lines
 
Stations
 
Length
 
Notes/Description
 
Type
 
BRT certified
  
Fort-de-France 
TCSP  [fr ] 
RTM (Martinique Transport Authority)
 
13 August 2018
 
2
 
18
 
13.9 km (8.6 mi)
 
 
 
Not BRT certified in 2022.[ 2]   
Metrobús on Avenida de los Insurgentes , crossing Paseo de la Reforma  in Mexico City Amistad station of the SITT BRT system in Tijuana  In the following table, BRT systems in light blue are under construction.
BRT systems in Mexico 
 
City
 
System name
 
Operator
 
Began
 
Lines
 
Stations
 
Length
 
Notes/Description
 
Type
 
BRT certified
  
Mexico City 
Trolleybuses in Mexico City 
Servicio de Transportes Eléctricos  (STE)
9 March 1951
 
11
 
303
 
203.64 km (126.54 mi)
 
 
eBRT trolleybuses 
 
Not BRT certified in 2015.[ 2]   
Mexico City Metrobús 
Sistema de Corredores de Transporte Público de Pasajeros del Distrito Federal
 
19 June 2005
 
7
 
283
 
174.6 km (108.5 mi)
 
The first line runs in dedicated lanes along Avenida Insurgentes , and there are seven lines (including one along Paseo de la Reforma ).[ 136]  
 
4 Silver + 1 Bronze BRT corridors certified (2013) & (2014) .[ 2]  
Metrobus - Line 1
 
19 June 2005
 
1
 
46
 
27.4 km (17.0 mi)
 
 
 
Silver BRT certified (2013) .[ 2]  
Metrobus - Line 2
 
16 December 2008
 
1
 
37
 
17 km (11 mi)
 
 
  
Metrobus - Line 3
 
8 February 2011
 
1
 
38
 
20 km (12 mi)
 
 
  
Metrobus - Line 4
 
1 April 2012
 
1
 
43
 
28 km (17 mi)
 
 
 
Bronze BRT certified (2013) .[ 2]  
Metrobus - L5 Río de los Remedios - San Lazaro
 
5 November 2013
 
1
 
51
 
10 km (6.2 mi)
 
 
 
Silver BRT certified (2014) .[ 2]  
State of Mexico 
Mexibús 
Transmasivo S.A.
 
2 October 2010
 
4
 
161
 
121.6 km (75.6 mi)
 
It is operated by Transmasivo (Lines I and IV) and Transcomunicador (Line II) and Transporte de Oriente (Line III)[ 137]  
 
Silver BRT certified (2014) .[ 2]  
Mexibús Line I  Transmasivo (Lines I and IV)
1 December 2010
 
1
 
34
 
20 km (12 mi)
 
  
Mexibús Line II  Transcomunicador (Line II)
12 January 2015
 
1
 
52
 
56.3 km (35.0 mi)
 
 
 
Not BRT certified in 2015.[ 2]   
Mexibús Line III  Red de Transporte de Oriente (Line III)
30 April 2013
 
1
 
45
 
23 km (14 mi)
 
 
 
Not BRT certified in 2013.[ 2]   
Mexibús Line IV  Transmasivo (Lines I and IV)
24 February 2021
 
1
 
30
 
22.3 km (13.9 mi)
 
 
 
Not BRT certified in 2022.[ 2]   
León, Guanajuato 
SIT Optibús 
Transportistas Coordinados de León
 
28 September 2003
 
10
 
65
 
65.1 km (40.5 mi)
 
[ 138] 
 
Not BRT certified in 2015.[ 2]   
Villahermosa 
Transbus Systems - Transmetropolitano (es  
Integrated Urban Transport SA de CV, Integrated Urban Transport of Villahermosa SC de RL de CV, Metropolitan Transport Pomoca SA de CV, Beach and Grill Transport SC de RL de CV
 
1 August 2008
 
1
 
100
 
47.4 km (29.5 mi)
 
 
 
Not BRT certified in 2015.[ 2]   
Guadalajara 
Guadalajara Mi Macro 
Mi Macro Calzada  (Alianza de Camioneros de Jalisco, Peribús Metropolitano)
10 March 2009
 
2
 
27
 
16 km (9.9 mi)
 
[ 139] 
 
Gold BRT certified (2013) .[ 2]  
Mi Macro Periférico  (Alianza de Camioneros de Jalisco, Peribús Metropolitano)
31 January 2022
 
2
 
42
 
41.5 km (25.8 mi)
 
 
 
Silver BRT certified (2024) .[ 2]  
San Andrés Cholula, Puebla 
Urban Articulated Transport Network (RUTA) (es  
Puebla Toll Roads (CCP)
 
16 January 2013
 
3
 
104
 
47.6 km (29.6 mi)
 
[ 140] 
 
Bronze BRT certified (2014) .[ 2]  
Chihuahua City 
Bowí (ViveBús) (es  
ViveBús Chihuahua Transport Operator, SA de CV
 
24 August 2013
 
1
 
42
 
20.4 km (12.7 mi)
 
 
 
Not BRT certified in 2015.[ 2]   
Ciudad Juárez 
BravoBús (es  
Juárez Transportation Integrator
 
30 November 2013
 
4
 
99
 
65 km (40 mi)
 
 
 
Not BRT certified in 2015.[ 2]   
Monterrey 
TransMetro (es  
Senda Group, Lazcano Group, TUS Group, Tuesa, Transcountry, Coremty, Sati Group, Trees Group
 
28 November 2002
 
2
 
-
 
10.7 km (6.6 mi)
 
 
 
Not BRT certified in 2015.[ 2]   
Ecovía 
Monterrey metropolitan area
 
28 January 2014
 
1
 
40
 
30.1 km (18.7 mi)
 
 
 
Silver BRT certified (2014) .[ 2]  
Pachuca 
Tuzobús (es  
Vanguard and Change Company SA de CV
 
16 August 2015
 
1
 
31
 
16.5 km (10.3 mi)
 
[ 141] 
 
Not BRT certified in 2022.[ 2]   
Acapulco 
Acabus (es  
Sistema Integral de Transporte (SIT)
 
25 June 2016
 
17
 
26
 
36.2 km (22.5 mi)
 
 
 
Not BRT certified in 2022.[ 2]   
Tijuana 
SITT (es  
SITT SA de CV
 
28 November 2016
 
2
 
47
 
22.9 km (14.2 mi)
 
The SITT BRT system operates a route from downtown Tijuana and Garita Puerto Mexico near the San Ysidro Port of Entry , southeast along the Tijuana River to Terminal Insurgentes in the southeastern part of the city.[ 142]  
 
Not BRT certified in 2022.[ 2]   
Querétaro 
Qrobús 
-
 
29 October 2017
 
2
 
20
 
32 km (20 mi)
 
 
 
Not BRT certified in 2022.[ 2]   
Mérida, Yucatán 
Ie-Tram Yucatán 
Mobility ADO  [es ] 
15 December 2023
 
5
 
67
 
116 km (72 mi)
 
 
eBRT electric buses 
 
Bronze BRT certified (2024) .[ 2]  
Oaxaca City 
Citybús (es  
Proyecto de Apoyo a la Movilidad Urbana y Renovación de Parque Vehicular en la Ciudad de Oaxaca
 
-
 
1
 
27
 
8.5 km (5.3 mi)
 
 
 
Not BRT certified in 2024.[ 2]   
Torreón 
Metrobús Laguna 
-
 
-
 
-
 
-
 
-
 
Under construction
 
 
  
Tampico 
Metrobús Tampico 
-
 
-
 
-
 
-
 
-
 
Under construction
 
 
  
San Luis Potosí 
-
 
-
 
-
 
-
 
-
 
-
 
Under construction
 
 
  
BRT systems in Panama 
 
City
 
System name
 
Operator
 
Began
 
Lines
 
Stations
 
Length
 
Notes/Description
 
Type
 
BRT certified
  
Panama City 
MiBus 
-
 
28 December 2010
 
10
 
15
 
5 km (3.1 mi)
 
 
 
Not BRT certified in 2012.[ 2]   
BRT systems in Puerto Rico 
 
City
 
System name
 
Operador
 
Began
 
Lines
 
Stations
 
Length
 
Notes/Description
 
Type
 
BRT certified
  
San Juan 
Urban Metro (es  
First Transit
 
26 October 2012
 
1
 
-
 
16.5 km (10.3 mi)
 
 
 
Not BRT certified in 2014.[ 2]   
Trinidad and Tobago [ edit ] Irisbus Civis of the MAX system in Las Vegas  G Line bus in the San Fernando Valley  in Los Angeles  In the following table, BRT systems in light blue are under construction.
BRT systems in United States 
 
City
 
System name
 
Operator
 
Began
 
Lines
 
Stations
 
Length
 
Notes/Description
 
Type
 
BRT certified
  
Atlanta MARTA Rapid Summerhill BRT 
Metropolitan Atlanta Rapid Transit Authority 
-
 
-
 
-
 
8 km (5.0 mi)
 
Under construction
MARTA's first bus rapid transit (BRT) line is currently under construction. The construction is scheduled to be completed in 2025 with revenue service beginning in late 2025. The 5-mile (8-kilometer) line will run from downtown Atlanta, through Summerhill, and end at the Atlanta Beltline. The line, named the "MARTA Rapid Summerhill", will utilize new 60-foot (18-meter) articulated electric buses.
 
 
Not BRT certified in 2024.[ 2]   
Albany  - Schenectady, New York 
BusPlus BRT Capital District Transportation Authority 4 April 2011 
- 
- 
- 
Not BRT certified in 2022.[ 2]   
Albuquerque, New Mexico Albuquerque Rapid Transit (ART) Rapid Ride 30 November 2019 
2 
19 
22.2 km (13.8 mi) 
First Gold-Standard BRT line in the United States[ 143] [ 144] [ 145]   
Allentown, Pennsylvania 
Enhanced Bus Service 
Lehigh and Northampton Transportation Authority (LANTA ) 
- 
- 
- 
- 
Blue Line and Green Line under construction[ 146]  
Not BRT certified in 2024.[ 2]   
Pitkin  and Garfield  Counties, Colorado
VelociRFTA BRT 
Roaring Fork Transportation Authority 
3 September 2013
 
1
 
18
 
71.5 km (44.4 mi)
 
 
 
Not BRT certified in 2014.[ 2]   
Austin, Texas 
CapMetro Rapid 
CapMetro 
26 January 2014
 
4
 
50
 
-
 
 
  
  
Birmingham, Alabama Birmingham Xpress Birmingham-Jefferson County Transit Authority 22 September 2022 
- 
18 
16 km (9.9 mi) 
[ 147] Not BRT certified in 2022.[ 2]   
Boston Silver Line Massachusetts Bay Transportation Authority  (MBTA)17 December 2004 
6 
20 
- 
Not BRT certified in 2013.[ 2]   
Columbus Avenue Bus Lanes[ 148]  
 
 
 
 
 
 
  
Charleston, South Carolina Lowcountry Rapid Transit - 
- 
- 
- 
- 
Planned, estimated to start in 2026. 
Not BRT certified in 2024.[ 2]   
Chicago 
Pace I-90 Express Bus 
Pace (transit) , Milwaukee  and Dempster  lines
-
 
4
 
25
 
43.4 km (27.0 mi)
 
 
 
Not BRT certified in 2022.[ 2]   
Pace Pulse 
11 August 2019
 
2
 
17
 
-
 
 
  
Cleveland HealthLine Greater Cleveland RTA 24 October 2008 
1 
59 
11 km (6.8 mi) 
Silver BRT certified (2013) .[ 2]  
Denver, Colorado 
LYNX
 
Regional Transportation District (RTD) 
2027 (Planned)
 
1 (Under Construction)
 
30
 
17.7 km (11.0 mi)
 
 
 
Not BRT certified in 2025
  
Columbus, Ohio CMAX Central Ohio Transit Authority  (COTA)1 January 2018 
- 
- 
25.1 km (15.6 mi) 
Not BRT certified in 2022.[ 2]   
El Paso, Texas Sun Metro Brio Sun Metro 27 October 2014 
- 
98 
86.6 km (53.8 mi) 
Not BRT certified in 2014.[ 2]   
Escondido, California Breeze Rapid North County Transit District 7 June 2011 
1 
25 
- 
  
Eugene, Oregon Emerald Express  (EmX)Lane Transit District  (Green Line)14 January 2007 
3 
37 
21 km (13 mi) 
Bronze BRT certified (2013) .[ 2]  
Fort Collins, Colorado MAX Bus Rapid Transit Transfort 10 May 2014 
- 
14 
15 km (9.3 mi) 
Not BRT certified in 2014.[ 2]   
Grand Rapids, Michigan 
Silver Line 
The Rapid 25 August 2014 
1 
34 
15 km (9.3 mi) 
  
Laker Line 24 August 2020 
1 
13 
21.4 km (13.3 mi) 
Not BRT certified in 2022.[ 2]   
Hartford, Connecticut CT Fastrak [ 149] CT Transit 28 March 2015 
4 
10 
15.1 km (9.4 mi) 
(New Britain-Hartford Busway) 
Silver BRT certified (2016) .[ 2]  
Houston METRO Quickline 
Metropolitan Transit Authority of Harris County 
1 June 2009
 
2
 
8
 
14.5 km (9.0 mi)
 
HOV system [ 150] [ 151] 
 
Not BRT certified in 2013.[ 2]   
METRORapid University Line 
2029
 
-
 
39
 
40 km (25 mi)
 
 
 
Not BRT certified in 2025.[ 2]   
METRORapid Silver Line 
23 August 2020
 
1
 
10
 
7.6 km (4.7 mi)
 
 
 
Not BRT certified in 2022.[ 2]   
Indianapolis 
Red Line 
Indianapolis Public Transportation Corporation, (IndyGo )
 
1 September 2019
 
-
 
28
 
21.1 km (13.1 mi)
 
 
  
Purple Line 13 October 2024 
- 
31 
24.5 km (15.2 mi) 
Not BRT certified in 2024.[ 2]   
Blue Line ( under construction) 
- 
- 
- 
39 km (24 mi) 
The Blue Line took place on 28 February 2025 and is anticipated to open in 2028[ 152]  
  
Jacksonville, Florida First Coast Flyer [ 153] Jacksonville Transportation Authority 7 December 2015 
4 
50 
93 km (58 mi) 
Not BRT certified in 2022.[ 2]   
Kansas City, Missouri Metro Area Express Kansas City Area Transportation Authority 24 July 2005 
3 
87 
51 km (32 mi) 
Not BRT certified in 2013.[ 2]   
Lake County, Indiana Broadway Metro Express Gary Public Transportation Corporation 19 February 2018 
- 
24 
- 
Not BRT certified in 2022.[ 2]   
Las Vegas ACE BRT RTC Transit - 
- 
- 
2 km (1.2 mi) 
RTC of Washoe County , Reno, Nevada  The first ACE line was named ACE Downtown Connector  and would travel from the World Market Center, Downtown Las Vegas, Las Vegas Convention Center, Las Vegas Strip, before finally terminating at McCarran Airport. Strip & Downtown Express (SDX) The MAX Line Las Vegas Blvd North, began 30 June 2004 and Ended service 20 February 2016.[ 154] BRT certified (2013) .[ 2]  
Los Angeles 
Los Angeles Metro Busway 
Los Angeles County Metropolitan Transportation Authority  (LACMTA)29 October 2005 
2 
29
 
89.6 km (55.7 mi)
 
Not BRT certified in 2013.[ 2]   
G Line Line number 901 
17
 
28.5 km (17.7 mi) 
Bronze BRT certified (2013) .[ 2]  
Harbor Transitway 26 June 1996 
- 
- 
16.6 km (10.3 mi) 
Harbor Gateway Transit Center Not BRT certified in 2013.[ 2]   
J Line 13 December 2009 
Line number 910 & 950 
12 
61 km (38 mi)
 
  
North Hollywood to Pasadena Bus Rapid Transit Project 2027 
- 
- 
- 
 
Not BRT certified in 2025.[ 2]   
Louisville, Kentucky Dixie Rapid 
Transit Authority of River City  (TARC)6 January 2020 
1 
18 
24 km (15 mi) 
Not BRT certified in 2022.[ 2]   
Madison, Wisconsin Rapid Route A Metro Transit (Madison) 22 September 2024 
3 
32 
- 
Metro Rapid Route A is a bus rapid transit service on an East-West alignment. 
eBRT electric buses  
Not BRT certified in 2024.[ 2]   
Miami-Dade County, Florida South Dade TransitWay Miami-Dade Transit 3 February 1997 
1 
28 
10.5 km (6.5 mi) 
Not BRT certified in 2013.[ 2]   
Milwaukee 
Connect 1 BRT 
Milwaukee County Transit System  (MCTS)4 June 2023 
- 
- 
14 km (8.7 mi) 
Not BRT certified in 2024.[ 2]   
Connect 2(planned, but on hold until further notice) [ 155]  
- 
- 
- 
- 
Not BRT certified in 2024.[ 2]   
Minneapolis–Saint Paul 
Metro Red Line 
Metro Transit 22 June 2013 
1 
5 
16.3 km (10.1 mi) 
Not BRT certified in 2013.[ 2]   
Metro Orange Line 4 December 2021 
1 
12 
27 km (17 mi) 
Not BRT certified in 2022.[ 2]   
Metro A Line 11 June 2016 
1 
20 
15.9 km (9.9 mi) 
  
Metro C Line 8 June 2019 
1 
20 
13.5 km (8.4 mi) 
  
U of M Transitway 
University of Minnesota Campus Shuttle 1992 
1 
2 
4.2 km (2.6 mi) 
Not BRT certified in 2013.[ 2]   
Newark, New Jersey Go Bus NJ Transit 25 September 2008 
2 
- 
- 
  
New York City Select Bus Service MTA Regional Bus Operations 2008 
17 
26 
102 km (63 mi) 
  
New Orleans RTA's BRT [ 156] New Orleans Regional Transit Authority  (NORTA)- 
- 
- 
- 
Not BRT certified in 2024.[ 2]   
Oakland, California Tempo BRT AC Transit 9 August 2020 
3 
34 
15.3 km (9.5 mi) 
Not BRT certified in 2022.[ 2]   
Omaha, Nebraska ORBT Metro Transit 18 November 2020 
1 
23 
13.2 km (8.2 mi) 
  
Orlando, Florida LYMMO (BRT) Central Florida Regional Transportation Authority (Lynx ) 
1997 
1 
22 
5.1 km (3.2 mi) 
Not BRT certified in 2013.[ 2]   
Philadelphia Boulevard Direct BRT SEPTA 22 October  2017 
1 
- 
- 
Not BRT certified in 2022.[ 2]   
Phoenix, Arizona Phoenix BRT (planned) 
- 
- 
- 
- 
Not BRT certified in 2024.[ 2]   
Pittsburgh 
Martin Luther King Jr. East Busway 
Pittsburgh Regional Transit February 1983 
1 
10 
14.6 km (9.1 mi) 
Bronze BRT certified (2013) .[ 2]  
West Busway September 2000 
1 
6 
8.2 km (5.1 mi) 
BRT certified (2013) .[ 2]  
South Busway December 1977 
1 
12 
6.9 km (4.3 mi) 
BRT certified (2013) .[ 2]  
Providence, Rhode Island 
East Side Transit Tunnel 
- 
1948 
1 
- 
- 
First BRT System in Providence, Rhode Island 
Not BRT certified in 2013.[ 2]   
Portland, Oregon Frequent Express TriMet 18 September 2022 
1 
47 
24 km (15 mi) 
A BRT completed between downtown Portland and downtown Gresham mainly following Southeast Division Street. 
Not BRT certified in 2024.[ 2]   
Provo  - Orem , Utah Utah Valley Express 
Utah Transit Authority  (UTA)13 August 2018 
1 
17 
17.7 km (11.0 mi) 
  
Ogden, Utah 
Ogden Express 29 August 2022 
1 
13 
8.5 km (5.3 mi) 
  
Midvalley Express - 
1 
15 
11 km (6.8 mi) 
Not BRT certified in 2024.[ 2]   
Salt Lake City 3500 South MAX 14 July 2008 
1 
26 
17.4 km (10.8 mi) 
Service Closed on 7 August 2022. 
 
Not BRT certified in 2013.[ 2]   
Raleigh, North Carolina GoRaleigh BRT Raleigh Transit Authority 
- 
- 
- 
- 
Not BRT certified in 2024.[ 2]   
Rochester, Minnesota Link BRT Rochester Public Transit - 
- 
- 
- 
Link BRT Construction is expected to begin in fall 2024, with operations commencing 2026. 
  
Richmond, Virginia GRTC Pulse Greater Richmond Transit Company 24 June 2018 
1 
14 
11 km (6.8 mi) 
Bronze BRT certified (2016 & 2024) .[ 2]  
San Bernardino, California sbX , (Green Line)Omnitrans 28 April 2014 
2 
- 
25 km (16 mi) 
(operated by Omnitrans), sbX Green Line, a 16-mile route from Verdemont  to Loma Linda .[ 157]  
Bronze BRT certified (2014) .[ 2]  
San Gabriel Valley 
El Monte Busway Foothill Transit January 1973 
- 
4 
19 km (12 mi) 
Not BRT certified in 2014.[ 2]   
Santa Monica, California Rapid 3 Big Blue Bus 24 June 2000 
3 
- 
- 
  
San Antonio VIA Primo Route 100 BRT VIA Metropolitan Transit 17 December 2012 
3 
11 
19 km (12 mi) 
Fredericksburg Road corridor BRT, connecting downtown with the South Texas Medical Center 
  
San Diego 
SuperLoop 
San Diego MTS 15 June 2009 
3 
17 
4.48 km (2.78 mi) 
  
Rapid (San Diego) 2002 
10 
39 
- 
  
San Francisco 
Van Ness BRT 
San Francisco Municipal Transportation Agency , Muni 1 April 2022 
1 
9 
3.15 km (1.96 mi) 
Silver BRT certified (2024) .[ 2]  
Geary BRT February 2021 
4 
26 
- 
Not BRT certified in 2024.[ 2]   
San Francisco Bay Area, California VTA Rapid Route 522 Santa Clara Valley Transportation Authority 5 July 2005 
2 
- 
- 
Rapid Route 522 from Eastridge Transit Center  in San Jose  to Palo Alto [ 158]  
Not BRT certified in 2013.[ 2]   
San Francisco Bay Area, California Tri-Valley Rapid [ 159] Livermore-Amador Valley Transportation Authority - 
- 
- 
- 
  
Seattle RapidRide G Line 
King County Metro 14 September 2024 
1 
21 
3.4 km (2.1 mi) 
Metro Bus Tunnel  shares with light rail different routes metro bus RapidRide Not BRT certified in 2024.[ 2]   
SODO Busway 8 December 1991 
1 
- 
2.4 km (1.5 mi) 
Not BRT certified in 2013.[ 2]   
Seattle metropolitan area Everett, Washington )
Swift BRT Community Transit 
29 November 2009 
3 
78 
65.2 km (40.5 mi) 
  
Seattle metropolitan area Kirkland, Washington )
Stride BRT 
Sound Transit 
2028 (S1 Line and S3 Line) to 2029 (S2 Line)
 
3
 
25
 
74 km (46 mi)
 
Three lines connecting to S1: Burien to Bellevue, S2: Bellevue to Lynnwood, S3: Shoreline to Bothell.[ 160]  
eBRT electric buses 
 
Not BRT certified in 2025.[ 2]   
Spokane, Washington City Line Spokane Transit Authority 15 July 2023 
1 
25 
10 km (6.2 mi) 
eBRT electric buses  
Not BRT certified in 2024.[ 2]   
Stockton, California BRT Express San Joaquin RTD - 
- 
- 
- 
Not BRT certified in 2013.[ 2]   
St. Louis Green Line (St. Louis MetroLink) Metro Transit (St. Louis) - 
1 
10 
9.3 km (5.8 mi)
 
It was to expect to have light rail due to the financial cost but considers to have bus rapid transit, green line corridor.[ 161]  
Not BRT certified in 2025.[ 2]   
St. Petersburg, Florida SunRunner BRT Pinellas Suncoast Transit Authority  (PSTA)October 2022 
- 
- 
- 
Not BRT certified in 2024.[ 2]   
Tulsa, Oklahoma Aero BRT [ 162] Tulsa Transit - 
- 
- 
- 
Not BRT certified in 2013.[ 2]   
Washington, DC Metropolitan Area 
Metroway 
Alexandria, Washington Metropolitan Area Transit Authority  (WMATA) 
24 August 2014 
1 
17 
11 km (6.8 mi) 
Not BRT certified in 2022.[ 2]   
Flash BRT 
Montgomery County, Maryland , Ride On 14 October 2020 
2 
12 
23 km (14 mi) 
  
Vancouver, Washington 
The Vine 
C-Tran (Washington) 
8 January 2017
 
2
 
71
 
26 km (16 mi)
 
 
  
Virginia Beach, Virginia VB Wave Hampton Roads Transit - 
- 
- 
- 
VB Wave (some BRT features) 
Not BRT certified in 2013.[ 2]   
The O-Bahn Busway in Adelaide , South Australia 
BRT systems in Australia 
 
City
 
System name
 
Operator
 
Began
 
Lines
 
Stations
 
Length
 
Notes/Description
 
Type
 
BRT certified
  
Adelaide 
O-Bahn Busway 
Torrens Transit 
9 March 1986
 
-
 
3
 
12 km (7.5 mi)
 
One of the world's longest, fastest and most heavily used guided busways .
 
 
Not BRT certified in 2013.[ 2]   
Brisbane 
South East Busway 
Transport for Brisbane , Clarks Logan City Bus Service , Mt Gravatt Bus Service , Transdev Queensland , Park Ridge Transit 
13 September 2000
 
1
 
13
 
13.2 km (8.2 mi)
 
Routes are linked through an underground hub in the central business district .Busways in Brisbane  carried over 70 million passengers in 2011.
 
 
Silver BRT certified (2013) .[ 2]  
Northern Busway 
Transport for Brisbane 
23 February 2004
 
1
 
13
 
-
 
  
Eastern Busway 
Transport for Brisbane 
3 August 2009
 
1
 
6
 
-
 
  
Brisbane Metro 
Transport for Brisbane 
28 January 2025
 
2
 
18
 
21 km (13 mi)
 
 
eBRT electric buses 
 
Not BRT certified in 2022.[ 2]   
Melbourne 
SmartBus 
CDC Melbourne , Kinetic Melbourne , Ventura Bus Lines 
1990
 
9
 
-
 
-
 
Has elements of BRT infrastructure but uses relatively few dedicated bus lanes.
 
  
Sydney 
B-Line 
Keolis Downer Northern Beaches 
26 November 2017
 
-
 
10
 
31 km (19 mi)
 
 
  
Liverpool–Parramatta T-way 
Transit Systems NSW 
2 February 2003
 
-
 
35
 
31 km (19 mi)
 
 
  
Metrobus 
Hillsbus , State Transit Authority , Transdev NSW , Transit Systems NSW , U-Go Mobility 
12 October 2008
 
13
 
-
 
-
 
M2 bus corridor.
 
  
North-West T-way 
Busways , Hillsbus 
10 March 2007
 
-
 
30
 
24 km (15 mi)
 
  
Northern Busway  North Shore, New ZealandIn the following table, BRT systems in light blue are under construction.
Metrobus del Bajo Buenos Aires  Metrobús de Buenos Aires , Estación Garrahan RIT 's double articulated buses servicing tube stations in downtown Curitiba Passengers boarding a Transoeste articulated bus at the Barra da Tijuca  terminal in Rio de Janeiro  Transcarioca  station at Galeão International Airport  in Rio de Janeiro In the following table, BRT systems in light blue are under construction.
BRT systems in Brazil 
 
City
 
System name
 
Operator
 
Began
 
Lines
 
Stations
 
Length
 
Notes/Description
 
Type
 
BRT certified
  
Criciúma 
Av. Centenírio
 
Criciumense Urban Transport Association (ACTU)
 
1996
 
3
 
16
 
8 km (5.0 mi)
 
 
 
Not BRT certified in 2013.[ 2]   
Curitiba 
Rede Integrada de Transporte 
Integrated Transport Network (RIT)
 
1974
 
6
 
21
 
81.4 km (50.6 mi)
 
[ 164] 
 
6 Silver + 1 Gold BRT corridors certified (2013) .[ 2]  
Boqueirao
 
-
 
-
 
-
 
10.3 km (6.4 mi)
 
  
South Circular
 
-
 
-
 
-
 
14.5 km (9.0 mi)
 
  
East line
 
-
 
-
 
-
 
12.4 km (7.7 mi)
 
  
Green Line
 
-
 
-
 
-
 
7.0 km (4.3 mi)
 
  
North line
 
-
 
-
 
-
 
8.9 km (5.5 mi)
 
  
West line
 
-
 
-
 
-
 
10.4 km (6.5 mi)
 
  
South line
 
-
 
-
 
-
 
10.6 km (6.6 mi)
 
  
São Paulo 
São Mateus–Jabaquara Metropolitan Corridor 
ABD Metropolitan Corridor, ABD Headband
 
3 December 1988
 
13
 
111
 
33 km (21 mi)
 
 
eBRT trolleybuses 
 
Bronze BRT corridors certified (2013) .[ 2]  
Expresso Tiradentes  (SPTrans )
Expresso Tiradentes (Southeast Axis)
 
8 March 2007
 
2
 
10
 
8.2 km (5.1 mi)
 
 
 
Silver BRT corridors certified (2013) .[ 2]  
Diadema–Morumbi Metropolitan Corridor  (Metra)
ABD Metropolitan Corridor, ABD Morumbi Extension
 
30 July 2010
 
1
 
28
 
12 km (7.5 mi)
 
 
 
Basic BRT corridors certified (2014) .[ 2]  
Guarulhos–São Paulo Metropolitan Corridor  (Metra)
Empresa Metropolitana de Transportes Urbanos de São Paulo  (EMTU)
3 July 2013
 
12
 
22
 
12.3 km (7.6 mi)
 
 
 
Not BRT certified in 2015.[ 2]   
Itapevi–Butantã Metropolitan Corridor  (Metra)
March 2018
 
-
 
42
 
23.6 km (14.7 mi)
 
 
 
Not BRT certified in 2022.[ 2]   
Corredor Metropolitano Noroeste (Metra)
 
2010
 
1
 
30
 
32.7 km (20.3 mi)
 
 
 
Not BRT certified in 2013.[ 2]   
BRT ABC  (Next Mobilidade)
2023
 
3
 
19
 
17.3 km (10.7 mi)
 
 
eBRT electric buses 
 
Not BRT certified in 2024.[ 2]   
São José dos Campos 
Linha Verde [ 165] -
 
2022
 
1
 
13
 
22 km (14 mi)
 
 
eBRT electric buses 
 
Not BRT certified in 2022.[ 2]   
Sorocaba 
BRT Sorocaba [ 166] Urbes
 
30 August 2020
 
2
 
12
 
12.2 km (7.6 mi)
 
 
  
Rio de Janeiro 
Rio de Janeiro BRT (MOBI-Rio)  [pt ] 
TransOeste 
6 June 2012
 
1
 
66
 
56 km (35 mi)
 
 
 
2 Gold +2 Silver BRT corridors certified (2013) .[ 2]  
TransCarioca 
1 June 2014
 
1
 
46
 
39 km (24 mi)
 
 
 
2 Gold +2 Silver BRT corridors certified (2014) .[ 2]  
TransOlímpica 
9 July 2016
 
1
 
21
 
26 km (16 mi)
 
 
 
2 Silver +2 Gold BRT corridors certified (2016) .[ 2]  
TransBrasil 
24 February 2024
 
1
 
19
 
26 km (16 mi)
 
 
 
2 Silver +2 Gold BRT corridors certified (2024) .[ 2]  
Goiânia 
Anhanguera Axis  [pt ] 
Governo do Estado de Goiás  (Metrobus)
1976
 
6
 
19
 
13.5 km (8.4 mi)
 
 
 
Bronze BRT certified (2014) .[ 2]  
Porto Alegre 
Companhia Carris Porto-Alegrense 
Empresa Pública de Transporte e Circulação (EPTC)
 
8 March 2014
 
11
 
9
 
55 km (34 mi)
 
 
 
Basic + Bronze BRT corridors certified (2016) .[ 2]  
Belo Horizonte 
BRT Move  [pt ] 
SETRA (municipal),
SINTRAM (metropolitan)
 
8 March 2014
 
29
 
56
 
23.1 km (14.4 mi)
 
 
 
1 Silver + 1 Gold BRT corridor certified (2014) .[ 2]  
Linha - Antonio Carlos
 
May 2014
 
1
 
24
 
16 km (9.9 mi)
 
 
  
Linha - Cristiano Machado
 
8 March 2014
 
1
 
9
 
7.1 km (4.4 mi)
 
 
  
Salvador, Bahia 
BRT Salvador  [pt ] 
Salvador Municipal Public Passenger Bus Transportation Service (STCO)
 
1 October 2022
 
4
 
14
 
6 km (3.7 mi)
 
 
eBRT electric buses 
 
Not BRT certified in 2022.[ 2]   
Campinas 
BRT of Campinas  [pt ] 
-
 
25 November 2022
 
7
 
17
 
36.6 km (22.7 mi)
 
Under construction from 2017 to 2020, it will have two main parallel lines Campo Grande and Ouro Verde and a secondary link Perimetral
 
  
Feira de Santana 
BRT Feira [ 167] Sistema (SMTT) Getúlio Vargas e João Durval
 
2020
 
2
 
16
 
20.5 km (12.7 mi)
 
  
Florianópolis 
Integrated Mobility System (SIM)  [pt ] 
Phoenix Consortium, COTISA, Florianópolis City Hall
 
-
 
-
 
-
 
17 km (11 mi)
 
Under construction
 
 
  
Uberlândia 
Integrated Transport System (SIT)  [pt ] 
Southeast Structural Corridor (Av. João Naves de Ávila)
 
8 September 1996
 
174
 
16
 
7.5 km (4.7 mi)
 
 
 
Silver BRT certified (2014) .[ 2]  
Belém 
BRT Belem  [pt ] 
Belém River, Nova Marambaia, Guamá River, Via Loc
 
2019
 
4
 
33
 
20 km (12 mi)
 
 
 
Not BRT certified in 2019.[ 2]   
Uberaba 
BRT Vetor 
Vetor East-West
 
31 January 2015
 
2
 
10
 
5.1 km (3.2 mi)
 
 
 
Silver BRT certified (2016) .[ 2]  
Juiz de Fora 
Av. Barão do Rio Branco
 
-
 
1982
 
1
 
8
 
3.1 km (1.9 mi)
 
 
 
Not BRT certified in 2013.[ 2]   
Londrina 
CMTU Londrina
 
3 linha, Rua João Cândido and Rua Duque de Caxias and Winston Churchill.  Companhia Municipal De Trânsito E Urbanização De Londrina (CMTU)
 
2010
 
3
 
29
 
6.8 km (4.2 mi)
 
 
 
Not BRT certified in 2013.[ 2]   
Fortaleza 
Fortaleza Express  [pt ] 
ETUFOR (Fortaleza Urban Transport Company)
Socicam
 
18 April 2015
 
2
 
15
 
17.4 km (10.8 mi)
 
 
 
Not BRT certified in 2015.[ 2]   
Brasília 
BRT Express DF  [pt ] 
Expresso DF Sul
 
2 April 2014
 
4
 
20
 
25.9 km (16.1 mi)
 
 
 
Bronze BRT certified (2014) .[ 2]  
Recife 
BRT Freeway of Recife  [pt ] 
-
 
2014
 
2
 
44
 
49.9 km (31.0 mi)
 
 
 
Basic + Bronze BRT corridors certified (2016) .[ 2]  
Via Livre East/West
 
18
 
8.2 km (5.1 mi)
 
 
  
Via Livre North/South
 
26
 
22.8 km (14.2 mi)
 
  
Teresina 
Inthegra  [pt ] 
SITT(Teresina Transport System)
STRANS SETUT
 
2 July 2016
 
7
 
40
 
24 km (15 mi)
 
 
 
Not BRT certified in 2022.[ 2]   
Maringá 
Mega BRT [ 168] Morangueira - Kakogawa, Transporte Coletivo Cidade Canção (TCCC)
 
2018
 
13
 
11
 
3.8 km (2.4 mi)
 
 
  
Manaus 
Expresso  [pt ] 
Bus Leader, Bus Company São Pedro, Express Coroado, Eucatur Group, Global GNZ, Via Verde,Vega
 
14 December 2002
 
3
 
4
 
20 km (12 mi)
 
 
 
Not BRT certified in 2013.[ 2]   
Natal, Rio Grande do Norte 
Av. Bernardo Vieira
 
Sistema Integrado de Transportes
 
2008
 
1
 
8
 
3.5 km (2.2 mi)
 
 
  
Niterói 
Corredor Metropolitano Alameda São Boaventura
 
2 linha Niterói
 
2010
 
1
 
6
 
8 km (5.0 mi)
 
 
  
TransOceânica
 
2019
 
1
 
13
 
9 km (5.6 mi)
 
 
 
BRT certified (2024) .[ 2]  
Transantiago  articulated buses  in Santiago In the following table, BRT systems in light blue are under construction.
BRT systems in Chile 
 
City
 
System name
 
Operator
 
Began
 
Lines
 
Stations
 
Length
 
Notes/Description
 
Type
 
BRT certified
  
Santiago 
Red Metropolitana de Movilidad 
STP Santiago S.A., Metro S.A., Tren Central
 
2007
 
5
 
29
 
90 km (56 mi)
 
Transantiago transit system is integrated between the electric Biotren  and BioBus, based on dedicated bus rights-of-way.
 
eBRT electric buses 
 
Bronze BRT certified (2014) .[ 2]  
Greece Avenue
 
-
 
10 km (6.2 mi)
  
Avenidas Las Industrias - Seirra Bella/Carmen
 
-
 
9.2 km (5.7 mi)
  
Pedro Aguirre Cerda - Exhibition/Bascunan Guerrero
 
-
 
11.5 km (7.1 mi)
  
Santa Rosa North
 
-
 
7.2 km (4.5 mi)
  
Santa Rosa South
 
-
 
8.5 km (5.3 mi)
  
Concepción 
SEREMITT Biobus  [es ] 
Intermodal Transport Service SA
 
26 May 2006
 
3
 
46
 
15.2 km (9.4 mi)
 
 
 
Not BRT certified in 2014.[ 2]   
Red Mobility Conception Network  [es ] 
EFE Sur  [es ] 
2026
 
2
 
-
 
50 km (31 mi)
 
Red Concepción de Movilidadses
 
eBRT electric buses 
 
  
TransMilenio  bus in Bogotá Transcaribe  bus in Cartagena , Colombia
BRT systems in Colombia 
 
City
 
System name
 
Operator
 
Began
 
Lines
 
Stations
 
Length
 
Notes/Description
 
Type
 
BRT certified
  
Bogotá 
TransMilenio 
Consorcio Express, Gmovil, BMO Sur, Connexion Móvil, Somos K, SI18, Somos Bogotá Usme
 
4 December 2000
 
12
 
143
 
114.4 km (71.1 mi)
 
Bogotá's segregated, four-lane TransMilenio system has a maximum peak-load capacity of 45,000 passengers per hour per direction  (pphpd) on its busiest line.[ 169] [ 169] [ 170] Bi-articulated buses  are used on the busiest routes, and a smart card  system is used for fare collection. Despite its large capacity, Transmilenio had problems with overcrowding.[ 171]  
 
2 Silver + 5 Gold BRT corridors certified (2013) .[ 2]  
TransMilenio - Autonorte
 
2 February 2002
 
1
 
-
 
11.6 km (7.2 mi)
 
 
 
Silver BRT certified (2013) .[ 2]  
TransMilenio - Suba
 
29 April 2006
 
1
 
-
 
9.6 km (6.0 mi)
 
 
 
Gold BRT certified (2013) .[ 2]  
TransMilenio - Caracas
 
-
 
-
 
-
 
7.3 km (4.5 mi)
 
 
 
Silver BRT certified (2013) .[ 2]  
TransMilenio - Calle 80
 
17 December 2000
 
1
 
-
 
7.5 km (4.7 mi)
 
 
 
Gold BRT certified (2013) .[ 2]  
TransMilenio - Americas
 
21 December 2003
 
1
 
3
 
12.7 km (7.9 mi)
 
 
  
TransMilenio - NQS
 
2005
 
1
 
-
 
8.6 km (5.3 mi)
 
 
  
TransMilenio - El Dorado
 
2005
 
1
 
-
 
10.8 km (6.7 mi)
 
 
  
Cali 
MIO 
Metro Cali S.A.
 
1 March 2009
 
9
 
77
 
39 km (24 mi)
 
Phase I completed; phase II under construction.
 
 
Silver BRT certified (2013) .[ 2]  
Medellín 
es:Metroplús 
Metroplus SA  [es ] 
22 December 2011
 
3
 
27
 
12.5 km (7.8 mi)
 
Line 2 opened 2013[ 172]  
 
Gold BRT certified (2013) .[ 2]  
Barranquilla 
Transmetro 
Transmetro S.A.
 
7 April 2010
 
2
 
18
 
13.2 km (8.2 mi)
 
 
 
Silver BRT certified (2013) .[ 2]  
Bucaramanga 
Metrolínea 
Metrolínea
 
22 December 2009
 
11
 
-
 
7.5 km (4.7 mi)
 
 
 
Silver BRT certified (2016) .[ 2]  
Pereira 
Megabús 
-
 
21 August 2006
 
3
 
60
 
19.2 km (11.9 mi)
 
 
 
Silver BRT certified (2013) .[ 2]  
Cartagena 
Transcaribe 
TransCaribe SA
 
17 November 2015
 
5
 
16
 
10.5 km (6.5 mi)
 
 
 
Silver BRT certified (2016) .[ 2]  
The Quito trolleybus system  has lines running on exclusive BRT lanes with underpass crossings. 
BRT systems in Ecuador 
 
City
 
System name
 
Operator
 
Began
 
Lines
 
Stations
 
Length
 
Notes/Description
 
Type
 
BRT certified
  
Quito 
Metrobus-Q  [es ] 
(Metropolitan Public Passenger Transport Company EPMTP Some private companies) Metrobus-Q - es:Trolebús de Quito , Central-Norte and Ecovia
 
17 December 1995
 
3
 
124
 
65.4 km (40.6 mi)
 
The BRT system Trolleybuses in Quito  operated by Compañía Trolebús Quito. Plans exist to convert the northernmost portion of the system to light rail. Ecovía and Metrobus  diesel BRT lines have several subsystems: Trolebús (Corredor Trole), Ecovía (Corredor Ecovía), Metrobús (Corredor Central Norte), Corredor Sur Oriental and Corredor Sur Occidental. Trolebús electric trolley buses can also operate on gas. Except for local routes, all buses are articulated.
 
eBRT trolleybuses 
 
Silver BRT certified (2013) .[ 2]  
Metrobus - Corredor sur occidental Empresa Metropolitana de Servicios y Administración del Transporte  (EMSAT)
 
13 July 2001
 
-
 
-
 
13.4 km (8.3 mi)
 
 
eBRT trolleybuses 
 
Bronze BRT certified (2014) .[ 2]  
Metrobus - Corredor sur oriental
 
-
 
-
 
-
 
11.1 km (6.9 mi)
 
  
Guayaquil 
Metrovía 
Fundación de Transporte Masivo Urbano de Guayaquil - Troncal 1: Guasmo-Río Daule
 
30 July 2006
 
7
 
26
 
30.51 km (18.96 mi)
 
 
 
Bronze BRT certified (2013) .[ 2]  
Metrovia - Troncal 2:
 
16 February 2012
 
-
 
-
 
13.9 km (8.6 mi)
 
  
Metrovia - Troncal 3 : Bastion-Centro
 
4 May 2008
 
-
 
-
 
16.5 km (10.3 mi)
 
 
  
Cuenca 
Troncal (100)  [es ] 
Sistema Integrado de Transporte (Línea 100, Línea 200)
 
2014
 
2
 
-
 
-
 
 
 
Not BRT certified in 2014.[ 2]   
Loja 
Loja Intermodal Urban Transport System (SITU)  [es ] 
-
 
18 November 2015
 
10
 
-
 
50 km (31 mi)
 
 
 
Not BRT certified in 2015.[ 2]   
In the following table, BRT systems in light blue are under construction.
BRT systems in French Guiana 
 
City
 
System name
 
Operator
 
Began
 
Lines
 
Stations
 
Length
 
Notes/Description
 
Type
 
BRT certified
  
Cayenne 
Cayenne BRT[ 173]  
-
 
-
 
-
 
-
 
-
 
 
 
  
Metropolitano  bus in Lima , Peru BusCaracas  in Caracas Trolleybuses in Mérida In the following table, BRT systems in light blue are under construction.
^ Stations connected by transfers are counted as one station, unless otherwise noted. 
^ Track length; lines which share track are counted once. 
^ Stations connected by transfers are counted as one station, unless otherwise noted. 
^ Corridor length; lines which sharing the same corridor are counted once. 
  
^ "ETHIOPIA: Construction and sustainability preparations for the Bus Rapid Transit (BRT) line 2 in Addis Ababa" . ADF . Retrieved 11 April  2025 .^ a b c d e f g h i j k l m n o p q r s t u v w x y z aa ab ac ad ae af ag ah ai aj ak al am an ao ap aq ar as at au av aw ax ay az ba bb bc bd be bf bg bh bi bj bk bl bm bn bo bp bq br bs bt bu bv bw bx by bz ca cb cc cd ce cf cg ch ci cj ck cl cm cn co cp cq cr cs ct cu cv cw cx cy cz da db dc dd de df dg dh di dj dk dl dm dn do dp dq dr ds dt du dv dw dx dy dz ea eb ec ed ee ef eg eh ei ej ek el em en eo ep eq er es et eu ev ew ex ey ez fa fb fc fd fe ff fg fh fi fj fk fl fm fn fo fp fq fr fs ft fu fv fw fx fy fz ga gb gc gd ge gf gg gh gi gj gk gl gm gn go gp gq gr gs gt gu gv gw gx gy gz ha hb hc hd he hf hg hh hi hj hk hl hm hn ho hp hq hr hs ht hu hv hw hx hy hz ia ib ic id ie if ig ih ii ij ik il im in io ip iq ir is it iu iv iw ix iy iz ja jb jc jd je jf jg jh ji jj jk jl jm jn jo jp jq jr js jt ju jv jw jx jy jz ka kb kc kd ke kf kg kh ki kj kk kl km kn ko kp kq kr ks kt ku kv kw kx ky kz la lb lc ld le lf lg lh li lj lk ll lm ln lo lp lq lr ls lt lu lv lw lx ly lz ma mb mc md me mf mg mh mi mj mk ml mm mn mo mp mq mr ms mt mu mv mw mx my mz na nb nc nd ne nf ng nh ni nj nk nl nm nn no np nq nr ns nt nu nv nw nx ny nz oa ob oc od oe of og oh oi oj ok ol om on   https://www.itdp.org/library/standards-and-guides/the-bus-rapid-transit-standard/best-practices-2013/  Archived  2015-02-07 at the Wayback Machine  Retrieved 2022-09-28^ "Bus Rapid Transit (BRT)" . State Information Services . 22 April 2007. Retrieved 19 February  2025 .^ "Egypt launches trial operation of Cairo Ring Road BRT first phase" . zawya.com . Retrieved 2 June  2025 .^ "Government to revamp BRT system" . www.ghanaweb.com . 5 August 2018. Retrieved 2020-03-21  .^ "Abidjan selects bus Intelligent Transport System in French-speaking African first" . www.trapezegroup.com . 22 March 2022. Retrieved 22 March  2022 .^ "Namara Bus Rapid Transit" .^ "Implementation of the first urban public transport project in Mayotte" . www.vinci.com . Retrieved 2 November  2022 .^ "Maputo BRT Feasibility Study Nears Completion" . GoalFore Advisory News . Retrieved 26 April  2024 .^ "BRT/BFS – Lagos State Transport Management" . lamata-ng.com . Archived from the original  on 2018-10-13. Retrieved 2017-10-11  .^ "Lamata Assures On Bus Rapid Transit Project" . allAfrica . 22 April 2007. Retrieved 30 June  2018 .^ "Rwanda: Kigali - Five Ways Bus Lanes Will Improve Public Transport" . All Africa . Retrieved 15 September  2024 .^ "Projet BRT - Bus Rapid Transit" . 18 October 2024.^ "MyCiTi IRT: Project information" . capetown.gov.za . Archived from the original  on 2013-07-25. Retrieved 2013-08-01  .^ "Go George Bus Rapid Transit" . gogeorge.org.za .^ [http://www.mg.co.za/article/2009-08-12-brt-offers-celebratory-free-rides-on-opening-day  BRT offers celebratory free rides on opening day.Like most transport projects, the system will be implemented in phases. Phase 1 of the estimated two-billion-rand  projects has run articulated right-of-way buses along dedicated median bus lanes in both directions across Johannesburg since 2010, covering almost half the city.M&G  
^ Laura Tyrer. "REA VAYA BRT SYSTEM" . Engineering News . ^ "City of johannesburg - All aboard for a greener Joburg" . Archived from the original  on 2008-10-10. Retrieved 2008-10-10  .^ Marleny Arnoldi. "JDA starts Rea Vaya bus lane, station construction in Sandton" . Engineering News . Retrieved 2025-01-24  . ^ "City of Ekurhuleni Harambee Bus Rapid Transit" . harambeebrt.co.za .^ " . Retrieved 26 November  2012 .^ "Host Cities for 2009 Confederations Cup: City of Mangaung (Vodacomd Park), City of Johannesburg (Ellis Park), City of Tshwane (Loftus Versveld), City of Mafikeng (Royal Bafokeng), Nelson Mandela Metro (PE) | PMG" . pmg.org.za .^ "Get Going With a Re Yeng" . areyeng.co.za .^ "BRT marches to Pretoria" . Independent Online . 29 June 2013.^ Irma Venter. "City of Tshwane bus rapid transit (BRT) system" . Engineering News . ^ "Rustenburg Yarona Bus Rapid Transit" . yaronabus.org.za .^ "Polokwane Leetola Bus Rapid Transit" . leetolapolokwane.co.za .^ "City engages Public Transport Industries on Revised GO!Durban Implementation Strategy" . godurban.co.za .^ "Mangaung Bus Rapid Transit" . mangaungtransit.org.za/ .^ "African Development Bank - Building today, a better Africa tomorrow"  (PDF) .^ "Project Description" . Arab Urban . Retrieved 11 April  2025 .^ "EOI - Uganda - Detailed Design Update of the Bus Rapid Transit System for the Greater Kampala Metropolitan Area (GKMA) - KCRRP" . 10 October 2023.^ "Institute for Transportation and Development Policy" . www.itdp.org . Archived from the original  on 2008-05-09.^ "盐城市区今年新建30座BRT站台_中国江苏网" . jsnews.jschina.com.cn . Retrieved 2022-04-14  .^ "银川新闻网--快速公交 幸福在路上" . www.ycen.com.cn . Archived from the original  on 2017-08-25. Retrieved 2019-04-01  .^ "银川公交公司-银川市公共交通有限公司" . www.ycgjgs.com . Archived from the original  on 2019-04-01. Retrieved 2019-04-01  .^ "我市首条快速公交示范线今开通_本地新闻_新闻频道_中山网" . www.zsnews.cn . Archived from the original  on 2019-04-01. Retrieved 2019-04-01  .^ "温州快速公交BRT一号线试运营" . 2016-03-04. Archived from the original  on 2016-03-04. Retrieved 2019-04-01  .^ "武汉首条BRT开通:快速公交贯通雄楚大道-武汉新房网-房天下" . newhouse.wuhan.fang.com . Retrieved 2017-05-12  .^ "体验过中运量公交 有一句话我一定要讲 | 观察-搜狐汽车" . auto.sohu.com . Retrieved 2017-05-12  .^ "奉浦快线运营:像坐地铁一样坐公交 感觉真不错-brt 快线 公交专用道 收藏 单程票-上海频道-东方网" . sh.eastday.com . Retrieved 2019-04-01  .^ " . newsxmwb.xinmin.cn . Retrieved 2019-04-01  .^ "Go, free to sit Guiyang BRT! January 21 opening of February 12 are free Oh - News" . www.top-news.top . Retrieved 2017-03-03  .^ "呼和浩特开启全新交通出行方式——BRT快速公交 —— 新华网内蒙古频道" . www.nmg.xinhuanet.com  (in Chinese (China)). Archived from the original  on 2017-09-27. Retrieved 2017-09-27  .^ "浙江义乌开通首条城区快速公交BRT - 津范儿" . tjfer  (in Chinese (China)). Retrieved 2017-06-28  .^ "临沂BRT快速公交模拟线路B-1开通 设站点28处" . www.ql1d.com . Retrieved 2017-09-10  .^ "南宁快速公交1号线开通运营 无缝对接地铁高铁-广西新闻网" . www.gxnews.com.cn . Retrieved 2017-05-12  .^ "南宁市快速公交(BRT)荣获2020年推动中国快速公交发展先进集体称号-交通新闻-广西壮族自治区交通运输厅" . zizhan.mot.gov.cn . Retrieved 2022-04-14  .^ "抚州BRT二期试运行_抚州新闻网" . www.zgfznews.com . Retrieved 2020-12-05  .^ "该文章已不存在_手机新浪网" . k.sina.cn .^ "江西日报整版报道:抚州快速公交成功运营的启示_政务_澎湃新闻-The Paper" . www.thepaper.cn . Retrieved 2020-12-05  .^ 网易 (2021-05-15). "自贡高铁公交快线即将开行" . www.163.com . Retrieved 2021-05-18  . ^ "站台6月底前亮相!自贡高铁公交快线将首现BRT公交站 - 自贡网 - 在这里,读懂盐都" . www.zgm.cn . Retrieved 2021-05-18  .^ "Growth of Bus Rapid Transit in India -" . 2016-04-06. Retrieved 2017-10-11  .^ a b   "Koridor" . transjakarta.co.id  (in Indonesian). Transjakarta . 2020. Retrieved 7 February  2021 .^ a b   Sutrisno, Budi (5 February 2020). "Achievement unlocked: Transjakarta breaks record for serving one million customers in a day" . The Jakarta Post . Retrieved 8 April  2020 . ^ "Konsep Bus Rapid Transit (BRT) di Luar Jakarta Masih Belum Tepat" . Bisnis.com  (in Indonesian). 22 September 2020. Retrieved 14 October  2021 .^ "Transjakarta – PT Transportasi Jakarta" . Transjakarta. Retrieved 9 February  2021 .^ "Jadwal Keberangkatan Bus Trans Batam di Semua Koridor (Masa Pandemi Covid-19)"  (in Indonesian). Government of Batam. 11 August 2020. Retrieved 8 February  2021 .^ "Data Trans Jogja"  (in Indonesian). Government of Yogyakarta. Retrieved 7 February  2021 .^ Husna, Maruti Asmaul (1 May 2020). "Penumpang Trans Jogja Menurun 93 Persen Lebih, Mulai 1 Mei 2020 Jumlah Armada Dikurangi 30 Persen" . Tribunjogja.com  (in Indonesian). Retrieved 24 January  2022 . COVID-19 pandemic  (1,402).^ "Ada Dua Rute Koridor Baru Bus TMP"  (in Indonesian). Government of Pekanbaru. 20 February 2020. Retrieved 7 February  2021 .^ Solehudin, Mochamad (12 November 2019). "Pemkot Bandung Operasikan TMB Rute Antapani-Stasiun Hall"  (in Indonesian). detik.com . Retrieved 9 February  2021 . ^ Darmaji, Dude (2021-12-28). Gunadi, Ude D. (ed.). "Masih Gratis, Bus Trans Metro Pasundan Resmi Beroperasi" . bandungraya.inews.id  (in Indonesian). iNews . Retrieved 2023-09-17  . ^ "BUS RAPID TRANSIT (BRT) TRANS MUSI"  (in Indonesian). PT Sarana Pembangunan Palembang Jaya. 2012. Retrieved 8 February  2021 .^ "BATIK SOLO TRANS (BST)"  (in Indonesian). Government of Surakarta. 2019. Retrieved 9 February  2021 .^ Adhi, Irawan Sapto (5 February 2017). "TRANSPORTASI SOLO : Baru 10.000 Orang Per Hari, Jumlah Penumpang BST Belum Sesuai Target"  (in Indonesian). Solopos . Retrieved 8 February  2021 . ^ "COMPANY PROFILE BLU UPTD TRANS SEMARANG"  (in Indonesian). Government of Semarang. 31 August 2020. Retrieved 8 February  2021 .^ "Trans Semarang's Main Corridor Line Diagram"  (in Indonesian). BLU Trans Semarang. 1 October 2020. Retrieved 8 February  2021 .^ Hafiyyan (19 July 2019). "Penumpang BRT Semarang Tumbuh 57%" . Semarang Bisnis.com  (in Indonesian). Retrieved 24 January  2022 . ^ Erviani, Ni Komang (25 May 2011). "New traffic control system, buses hoped to ease congestion" . The Jakarta Post. Retrieved 7 February  2021 . ^ "Trans Sarbagita: Denpasar-Jimbaran route starts Friday" . 10 August 2012. Archived from the original  on 24 August 2012. Retrieved 10 August  2012 .^ H.N., Oyos Saroso (22 September 2011). "Bandarlampung to unveil BRT as passenger-friendly transport" . The Jakarta Post. Archived from the original  on 28 July 2020. Retrieved 8 February  2021 . ^ "InfoPublik - Penumpang Trans Padang Melonjak, Laba Perumda PSM Meningkat" . infopublik.id  (in Indonesian). 13 December 2023. Retrieved 11 July  2024 .^ Yermadona, Helga  (January 2019). "Evaluasi Fasilitas dan Jarak Tempat Perhentian Kendaraan Penumpang Umum Trans Padang"  (PDF ) . Rang Teknik Journal  (in Indonesian). 2  (1): 40– 48. doi :10.31869/rtj.v2i1.1080 S2CID  189406184 . Retrieved 9 February  2021 .^ "Sudah Beroperasi, Ini Jadwal Bus Trans Padang Teluk Bayur – Kalumpang"  (in Indonesian). Laggam. 3 February 2020. Retrieved 9 February  2021 .^ "Tak Dilewati Bus, 105 Halte BRT di Makassar Mangkrak"  (in Indonesian). Tempo . 11 October 2019. Retrieved 9 February  2021 .^ "Bus Trans Koetaradja"  (in Indonesian). Visit Aceh. December 2019. Archived from the original  on 4 June 2023. Retrieved 9 February  2021 .^ "Lokasi Halte Trans Koetaradja"  (in Indonesian). Government of Banda Aceh. 26 February 2018. Retrieved 9 February  2021 .^ "Teman Bus Segera Hadir di Jalanan Surabaya" . Trisnews  (in Indonesian). December 2021. Retrieved 2021-12-23  .^ "BRT в Алматы протянется на 102 километра и охватит основные улицы" . Главные новости Казахстана - Tengrinews.kz . January 27, 2023.^ "Vientiane's Bus Rapid Transit Service Set to Begin Trial Operations by End of August" . 7 July 2025.^ "Public transport projects in Greater Beirut and beyond" . 8 July 2019.^ "Yangon gets new bus rapid transit system" . 17 May 2016.^ a b   "Expensive metro bus" . DAWN.COM . 2015-11-22. Retrieved 2018-06-09  .^ a b   Jamal, Sana (2018-05-31). "Pakistan government completes its five year term" . GulfNews . Retrieved 2018-06-09  . ^ "Rawalpindi - Islamabad: Metro buses to be running from May 1 - PKKH.tv" . PKKH.tv . 2015-04-18. Retrieved 2018-06-09  .^ "PM to inaugurate Rawalpindi/Islamabad Metro Bus Project" . The Nation . 2014-03-22. Retrieved 2018-06-09  .^ "Islamabad Starts Trial of Orange Line Metro Bus Service" . INCPAK . 2022-04-16. Retrieved 2022-04-18  .^ "PM Shehbaz Sharif confident his 'speedy work' will frighten ex-premier Imran Khan" . GEO News . 2022-04-18. Retrieved 2022-04-18  .^ "Multan Metrobus System | Punjab Masstransit Authority" . pma.punjab.gov.pk . Archived from the original  on 2020-11-23. Retrieved 2018-06-09  .^ "NAB chief approves probe into Multan Metro" . www.pakistantoday.com.pk . Retrieved 2018-06-09  .^ "Experts say it may take up to a year" . The Nation . 2018-06-01. Retrieved 2018-06-09  .^ Bureau Report (2017-10-05). "CM to open work on BRT project on 20th" . DAWN.COM . Retrieved 2018-06-09  . ^ "CM Khattak inaugurates Bus Rapid Transit project in Peshawar" . Geo News . Retrieved 2018-06-09  .^ "KP CM to inaugurate bus rapid transit Peshawar on Oct19 - Samaa TV" . www.samaa.tv . Retrieved 2018-06-09  .^ Dawn.com (2014-07-10). "PM announces Rs15bn for Karachi 'Green Line' bus project" . DAWN.COM . Retrieved 2018-06-09  . ^ "Ground-breaking ceremony: Green Line BRT finally gets go-ahead - The Express Tribune" . The Express Tribune . 2016-02-27. Retrieved 2018-06-09  .^ Zurbano, Joel (June 24, 2020). "EDSA Busway seamless and faster—DOTr" . Manila Bulletin . Retrieved July 13,  2020 . ^ 헤럴드경제. "고양~수색 BRT 개통 1주일 연기" . heraldcorp.com . ^ 기호일보 (29 September 2013). "하남 BRT 차고지 준공 1200명 참가 축하 인사" . 기호일보 . ^ "[인천/경기]'청라~강서 BRT' 이용객 꾸준히 증가" . donga.com . 12 February 2014.^ "優化公車專用道"  (PDF) . Bureau of Transportation, Taichung City. Retrieved 18 April  2020 .^ "Dubai to get 32km-long Bus Rapid Transit System by 2019" . Khaleej Times . 18 June 2018. Retrieved 18 June  2018 .^ "Om Plusbus" . plusbus  (in Danish). Archived from the original  on 2022-02-27. Retrieved 2023-08-17  .^ "Offiziell: An diesem Tag eröffnet der Plusbus" . migogaalborg  (in Danish). 24 May 2023. Retrieved 2024-02-10  .^ "FIRST BRT LINE IN DENMARK" . 30 January 2024. Retrieved 2024-01-30  .^ Hsy / Hsl  Archived  2008-03-30 at the Wayback Machine ^ "Bus à Haut Niveau de Service (BHNS)" . Geoconfluences  (in French). 3 July 2024. Retrieved 2024-07-02  .^ Budach, Dirk (23 November 2020). "Bus Rapid Transit: The future of public transport in Clermont-Ferrand" . Urban Transport Magazine . Retrieved 2020-11-23  . ^ "Phileas: A Peek Into The Future Of Public Transport" . www.carsession.com . 31 October 2025. Retrieved 2013-08-26  .^  https://web.archive.org/web/20071013160451/http://www.bhns.fr/IMG/pdf/Evry_monographie_2005.pdf . Archived from the original  (PDF)  on 2007-10-13. ^ "First Phase of Borgarlína Project Delayed by One Year" . 29 June 2022. Retrieved 2022-06-29  .^ Editorial Staff (2025-05-01). "Italy, a first tender for the future electric BRT in Taranto. 50 e-buses will be operating" . Retrieved 2020-06-29  . ^ Editorial Staff (2025-10-29). "Turin to launch a BRT line and to deploy 315 new electric buses by 2026 within a reorganization of transit network" . www.sustainable-bus.com . Retrieved 2023-04-06  . ^ Bernhardt, Jens (2025-05-01). "112 battery trolleybuses for Genoa's new BRT system" . Retrieved 2024-01-18  . ^ Jack, Robert (2025-05-01). "Bussveien – Europe's longest BRT system" . Retrieved 2022-07-01  . ^ "Inaugurada a nova Praça 25 de Abril (Opening of the new Praça 25 de Abril)" . metromondego.pt . 25 April 2024.^ "Bus Rapid Transit System tender launched to link Boavista to Foz in 2023" . Porto.pt . 6 July 2021.^ "Metrobus vai ligar Império à Boavista no Porto em 2023 (Metrobus will connect Império to Boavista in Porto in 2023)" . SAPO . 6 July 2021.^ Ann Brody Guy. "Using ITS Research, Barcelona Launches BRT Network" . Berkeley Transportation Letter. Retrieved 2010-06-08  . ^ Azaola, Guillermo (26 September 2022). "Busrapid circulará por la periferia y ampliará su red para conectarla con el centro de Madrid" . 20minutos.es  (in Spanish). Madrid. Retrieved 7 February  2023 . ^ "La primera línea de bus rápido comienza a operar entre Valdebebas, Sanchinarro y el Hospital Ramón y Cajal" . diario.madrid.es  (in Spanish). Madrid: Ayuntamiento de Madrid. 30 May 2023. Retrieved 30 May  2023 .^ "Greater Manchester bus priority package consultation"  (PDF) . Transport for Greater Manchester . August 2012. Archived from the original  (PDF)  on 2016-04-15.^ Lesley, Lewis (1983). "Runcorn - A Rapid Transit New Town?". Built Environment . 9  (3/4): 234. JSTOR  23286723 . ^ "Runcorn New Town - 7.3 Transport" . rudi.net . Archived from the original  on 18 October 2014. Retrieved 24 July  2020 .^ "City of Brampton - Planning" . www.brampton.ca . Archived from the original  on 2010-05-09.^ "Stage 2 Rapid Transit to Cambridge" . www.engagewr.ca . Retrieved 8 October  2025 .^ "Integrated PIE-IX BRT Project" . Société de transport de Montréal . Retrieved 17 November  2020 .^ "Spadina Subway Extension""TTC Overview" . Archived from the original  on 2010-01-10. Retrieved 2010-03-13  . 
^ "TTC RapidTO: Priority bus lane implementation" http://www.ttc.ca/About_the_TTC/Projects/5_year_plan_and_10_y/Priority_Lanes.jsp . 
^ Chan, Kenneth (April 12, 2023). "BC Transit launches first RapidBus route serving Victoria" . Daily Hive . Retrieved May 1,  2023 . ^ "What is Bus Rapid Transit (BRT)?" . myride.winnipegtransit.com . Archived from the original  on 2010-06-12.^ "Viva Rapid Transit Construction Underway."http://www.vivanext.com/391 , December 14, 2009. 
^ "Viva buses operate along new Enterprise rapidly, starting March 6" http://transittoronto.ca/archives/weblog/2011/03/04-viva_buses.shtml . 
^ "Metrobus" . Archived from the original  on September 30, 2013. Retrieved July 3,  2018 .^ "Mexibús" . dbpedia.org . Retrieved 15 October  2025 .^ "Gmail" . correo.leon.gob.mx . Archived from the original  on 2005-04-09.^ Hidalgo, D.; Voukas, Y.; Freiberg, G.; Lopez, A.; Alveano, S. (16–18 July 2010). The macrobus system of Guadalajara, Mexico: an evolved concept in BRT planning and implementation for medium capacity corridors . Retrieved 11 October  2021 . ^ "Route Puebla: Urban Articulated Transport Network" . Retrieved July 3,  2018 .^ "Tuzobus" . Archived from the original  on 2015-10-12. Retrieved 2015-10-07  .^ "Rutasymapas – SISTEMA INTEGRAL DE TRANSPORTE DE TIJUANA" . www.sitt.org.mx . Archived from the original  on 2017-10-17.^ "Albuquerque, NM Opens First USA Gold Standard BRT on Historic Route 66" . 27 November 2017.^ "ART System Receives Rare Gold Standard from ITDP"  (Press release). 27 November 2017.^ "Albuquerque BRT receives rare 'Gold Standard' recognition" .^ "EBS – Enhanced Bus Service" . LANTA . Archived  from the original on 2024-11-04. Retrieved 2025-03-02  .^ "Birmingham Xpress – MAX Transit – Birmingham Jefferson County Transit Authority" . Retrieved 2022-10-08  .^ "Columbus Avenue Bus Lanes" . Retrieved 2023-03-03  .^ "CTfastrak.com - HOME" . ctfastrak.com .^ "Bus Shuttles METRO" .^ "METRORapid | Bus Rapid Transit | Public transportation | Houston, TX" .^ "IndyGo breaks ground on Blue Line project" . wthr.com . 2025-02-28. Retrieved 2025-03-03  .^ "About - First Coast Flyer" . JTA First Coast Flyer . Jacksonville Transportation Authority. Retrieved 5 February  2020 .^ Schlaikjer, Erica (14 April 2010). "BRT Hits the Las Vegas Strip" . The City Fix . Retrieved 2025-03-23  . ^ Swales, Vanessa. "MCTS recommends pausing new bus rapid transit line under Milwaukee County budget crunch" . Journal Sentinel . ^ "RTA's Bus Rapid Transit" . Retrieved 2025-03-25  .^ www.estreet-sbx.com  https://web.archive.org/web/20110710203129/http://www.estreet-sbx.com/docManager/1000000450/sbx%20Winter2011%20FINAL.pdf . Archived from the original  (PDF)  on 2011-07-10.^ "Route 522" . Santa Clara Valley Transportation Authority . Retrieved July 4,  2018 .^ "Ride Rapid" . LAVTA . Retrieved 2024-11-08  .^ "Sound Transit Breaks Ground on Stride Electric Bus Base in Bothell" . www.theurbanist.org . 16 August 2025. Retrieved 2025-08-16  .^ "Metro Transit Considers Shift to Bus Rapid Transit for Green Line Corridor" . cmt-stl.org . 24 September 2025. Retrieved 2025-09-24  .^ "The Bus Rapid Transit (BRT)" . Metrolink . Retrieved 2025-05-01  .^ " . www.busnews.com.au/ . 9 December 2019. Retrieved 2019-12-09  .^ "HISTÓRIA: Vídeo retrata primeiros anos do BRT pioneiro no mundo"  (in Portuguese). 30 December 2018. Retrieved 2022-04-03  .^ "Linha Verde amplia sua operação até a região central"  (in Portuguese). 3 December 2022. Retrieved 2022-12-03  .^ "brtsorocaba"  (in Portuguese). 8 April 2025. Retrieved 2025-04-08  .^ "Colbert Filho bota pra rodar o BRT-2 com 20,5 km de extensão"  (in Portuguese). 18 September 2024. Retrieved 2024-09-18  .^ "Novos onibus BRT fabricados pela Marcopolo chegam a Maringá e reajuste da tarifa pode ser liberado em breve"  (in Portuguese). 25 January 2018. Retrieved 2019-01-25  .^ a b   Institute for Transportation and Development Policy, Appendix 1 System Comparisons, BRT Planning Guide 
^ FTA_ Commissioned report, Advanced Network Planning for Bus Rapid Transit The Quickway Model as a Modal Alternative to "Light Rail Lite" 
^ "Applicability of Bogotá's TransMilenio BRT System to the United States"  Archived  2011-07-26 at the Wayback Machine  NBRTI (May 2006). Retrieved 15 March 2010.^ "Global BRT Data" . BRTDATA.ORG. Retrieved 22 August  2014 .^ "Signature of P3 BRT contract in Cayenne, French Guiana"  (in French). 20 December 2019. Retrieved 2025-03-15  .  
Vehicles SystemsList ) See also