Jump to content

Belait CSS-1

From Wikipedia, the free encyclopedia
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
Belait CSS-1 docked in Muara Port on 22 May 2015.
History
Brunei
NameBelait CSS-1
OwnerBelait Shipping
Port of registryMuara, Brunei
BuilderMawei Shipbuilding Co., China
Cost526 million yuan ($80 million)
Acquired25 February 2015
Commissioned25 February 2015
Identification
StatusActive
General characteristics
TypeAccommodation platform
Displacement3,800 tons
Length84 m (275 ft 7 in)
Draught10.5 m (34 ft 5 in)
Depth20.5 m (67 ft 3 in)
Propulsion6 × 2,800 kW generators
Speed9.1 knots (16.9 km/h; 10.5 mph) maximum
Boats & landing
craft carried
4 × lifeboats
Aviation facilitiesHelicopter landing platform

Belait CSS-1 is a well intervention vessel and accommodation platform owned by Belait Shipping. She can provide places for accommodations, and perform maintenance, rescue, and hoist activities.[1] She has a sister ship named Belait CSS-2, commissioned four years after CSS-1.

Construction and career

Construction of Belait CSS-1 was commissioned by Belait CSS Sendirian Berhad, an SPV Company registered in Brunei Darussalam. Belait CSS-1 was primarily built as a well-intervention vessel to support production of oil in Brunei. She cost about 526 million yuan ($80 million),[2] was built in Fujian, China and registered in Muara, Brunei.

Belait CSS-1 was undocked from the shipyard on 7 December 2013 and delivered to Brunei on 25 February 2015.[3][4] She regularly travels to the Champion Field, which is a complex oil and gas field, situated 40 kilometres (25 mi) north-northwest of Bandar Seri Begawan, in water depths of 10 to 45 metres. She usually docks in Muara Port, Brunei after every return voyages.

Equipment

The CSS is a multi-function well-intervention, supply, and light construction vessel, with accommodation for workers. It is equipped with a 150 t lattice boom crane, a telescopic heave compensated gangway, a moonpool, a 12.8 t rated helideck, DP-2 rating, and accommodation up to 200 people.[5]

She was designed by Vard Marine. The CSS is a cost-effective, stable platform with most of the capabilities of much larger vessels at a far lower cost. In addition, the design can be built at shipyards around the world.[6]

References

  1. ^ "BELAIT CSS 1 (Platform) Registered in Brunei - Vessel details, Current position and Voyage information - IMO 9676785, MMSI 508111180, Call Sign V8V3145". www.marinetraffic.com. Retrieved 2020-08-01.
  2. ^ "Belait Shipping & QESS - shipping Brunei - Awang Haji Ali". The Business Report. Retrieved 2020-07-31.
  3. ^ "The delivery for the fifth multi-purpose PSV with twin-hull semisubmersible platform - Eshiptrading.com". www.eshiptrading.com. Retrieved 2020-07-31.
  4. ^ "China: Construction of Belait CSS 1 Nears Completion". Offshore Energy. 2013-12-12. Retrieved 2020-08-01.
  5. ^ "Belait CSS 1 Undocks from Fujian Mawei Shipyard". Offshore Energy. 2013-12-12. Retrieved 2020-07-31.
  6. ^ "Compact Semi-Submersible (CSS) Designs - Vard Marine Inc". Vard Marine. Retrieved 2020-07-31.