Graphical Evaluation and Review Technique

From Wikipedia, the free encyclopedia
This is an old revision of this page, as edited by The Epopt (talk | contribs) at 23:11, 5 December 2006 (The Guide to the PMBOK does not mention GERT at all.). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Graphical Evaluation and Review Technique, commonly known as GERT, is a network analysis technique used in project management that allows probabilistic treatment of both network logic and activity duration estimated. The technique was first described in 1966 by Dr. Alan B. Pritsker of Purdue University and WW Happ[1].

References

  1. ^ Pritsker, A. A. B. (April 1966). "GERT: Graphical Evaluation and Review Technique" (PDF). RM-4973-NASA. National Aeronautics and Space Administration under Contract No. NASr-21. Retrieved 2006-12-05. {{cite journal}}: Cite journal requires |journal= (help)