Precedence diagram method

From Wikipedia, the free encyclopedia
This is an old revision of this page, as edited by Jllatimer (talk | contribs) at 08:36, 18 April 2015 (PDM and AON mean the same thing. May need to add PMBOK as reference.). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

The precedence diagram method (PDM) is a tool for scheduling activities in a project plan. It is a method of constructing a project schedule network diagram that uses boxes, referred to as nodes, to represent activities and connects them with arrows that show the dependencies. It is also called the activity-on-node (AON) method.

  • Critical tasks, noncritical tasks, and slack time
  • Shows the relationship of the tasks to each other
  • Allows for what-if, worst-case, best-case and most likely scenario

Key elements include determining predecessors and defining attributes such as

  • early start date..
  • late start date
  • early finish date
  • late finish date
  • duration
  • WBS reference
solving the PDM, with: BS is an early start date. BM is a late start date. KS is an early finish date. KM is a late finish date.