Jump to content

Railway block code

From Wikipedia, the free encyclopedia
This is an old revision of this page, as edited by 87.112.9.117 (talk) at 22:59, 21 June 2014 (Examples: citation added). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

The railway block signalling bell code is a system of bell rings used in Great Britain to communicate between manually operated Signal Boxes (the system is not used in modern power signal boxes). Each signal box would have a bell circuit to the box on either side of it along the line. The equipment would consist of a plunger or tapper (rather like a Morse key) which if pressed, rings the bell in the neighbouring box. The neighbouring box would have a key for communicating back, therefore each box has a key which rings the bell in the other box. Where a signal box communicates with more than one other box (in either direction along the line, and possibly along a branch line too), each bell would have a different tone, so that the signalman could tell them apart by ear.

Examples

Although codes varied from region to region, the following shows a few selected standard UK bell codes:

Code Meaning
1 bell Call attention
2 bells Train entering section
2 - 3 bells (2 bells, pause, 3 bells) Is line clear for light engine?
3 - 1 Is line clear for stopping passenger train?
4 Is line clear for express passenger train?
2 - 1 Train arrived
3 - 3 Blocking back outside home signal
5 - 2 Release token [for single line sections only]
2 - 5 Token replaced
5 - 5 - 5 Opening signal box
6 Obstruction danger
4 - 5 - 5 Train running away on Right Line
2 - 5 - 5 Train running away on Wrong Line
16 Testing bells and instruments

[1]

Typical use

These would be used as follows (assuming a simple exchange between two signal boxes on a plain section of line) between two signal boxes A and B. Assume a train is to pass from the block controlled by A to the block controlled by B. This must be agreed and permitted by the signalman in box B. Here is the sequence of bell codes and associated actions:

  1. Box A sends 1 bell to box B. (Call attention.)
  2. Box B replies with 1 bell to box A. (Acknowledgement, indicating readiness.)
  3. Box A sends 4 bells to box B. (Is line clear for express passenger train?)
  4. Box B sends 4 bells to box A. (Acknowledgement, giving permission for box A to signal the train into the block controlled by B.)
  5. (Slightly later.) Box A sends 2 bells to box B. (Train entering section.) This is sent as the train passes box A and enters the block controlled by B.
  6. Box B sends 2 - 1 bells to box A. (Only after confirming that the train has arrived complete and no portion of it remains within the block section between A and B. This could be done by the guard of the train notifying the signalman or by the signalman observing the tail-lamp.)

See also

  • Bell codes are used on multiple unit trains for communication between drivers and guards.
  • Whistle codes are used by railway engines to communicate with signal boxes and other staff.

References


  1. ^ BR Regulations for Train Signalling 1st Oct 1960