Talk:Iterative and incremental development
This is the talk page for discussing improvements to the Iterative and incremental development article. This is not a forum for general discussion of the article's subject. |
Article policies
|
Find sources: Google (books · news · scholar · free images · WP refs) · FENS · JSTOR · TWL |
What are the advantages of "V" Model over the other life cycle models. —The preceding unsigned comment was added by 209.78.112.253 (talk • contribs) 19:09, 19 January 2006 (UTC2)
Merge with Incremental build model
Agree with the merge of Incremental build model.
- A quick Googling of incremental build model shows that the term is hardly in use.
- The article is a stub, and is vague to the point of being useless.
- It is redundant to the text in this article.
—The preceding unsigned comment was added by 65.222.202.26 (talk • contribs) 18:45, 13 March 2006 (UTC2)
A project iteration, especially in the DW business process, is not necessarily incremental development. —The preceding unsigned comment was added by 83.41.43.222 (talk • contribs) 00:37, 25 March 2006 (UTC2)
I can certainly understand the point of merging these two documents. However, as a student studying Software Engineering, I can recognize the differences. I think it would be beneficial to keep these two articles seperate. I realize that there is an overlap in material, but there is also a vast amount of differences that the stub seems not to have taken account of. —The preceding unsigned comment was added by Blatyo (talk • contribs) 16:40, 6 April 2006 (UTC2)