Jump to content

Talk:Iterative and incremental development

Page contents not supported in other languages.
From Wikipedia, the free encyclopedia
This is an old revision of this page, as edited by Blatyo (talk | contribs) at 14:40, 6 April 2006 (Merging). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

What are the advantages of "V" Model over the other life cycle models.

Agree with the merge of Incremental build model.

  1. A quick Googling of incremental build model shows that the term is hardly in use.
  2. The article is a stub, and is vague to the point of being useless.
  3. It is redundant to the text in this article.

A project iteration, especially in the DW business process, is not necessarily incremental development.

Merging

I can certainly understand the point of merging these two documents. However, as a student studying Software Engineering, I can recognize the differences. I think it would be beneficial to keep these two articles seperate. I realize that there is an overlap in material, but there is also a vast amount of differences that the stub seems not to have taken account of.