Xiaolangdi Dam
Appearance
Xiaolangdi Dam | |
---|---|
![]() | |
Construction cost | US$3.5 billion |
Website Official website |
The Xiaolangdi Dam (Chinese: 小浪底; Pinyin: Xiǎolàngdǐ) is a dam in Jiyuan, Henan Province, China, and impounds the Yellow River. The facility has a total installed capacity of 1,836 MW and generates up to 5.1 TWh annually with the help of six 306 MW turbines. The dam stands 154 m (505 ft) tall and 1,317 m (4,321 ft) wide, and cost US$3.5 billion to construct. [1][2]
See also
References
- ^ "Xiaolangdi Hydroelectric Power Plant China, China". Power-Technology. Retrieved 23 August 2011.
- ^ Structural specifications of the Xiaolangdi Dam