Arrow diagramming method

From Wikipedia, the free encyclopedia
This is an old revision of this page, as edited by JBW (talk | contribs) at 13:52, 14 May 2010 (Reverted edits by ArdorRey (talk) to last version by 122.161.32.80). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Arrow Diagramming Method (ADM) is a network diagramming technique in which activities are represented by arrows. It is used for scheduling activities in a project plan.
The precedence relation between activities is represented by circles connecting to one or more arrows. The length of the arrow represents the duration of the relevant activity.

Sometimes a "dummy task" is added, to represent a dependency between tasks, which does not represent any activity.

ADM example

Use of the Arrow Diagramming Method as a common project management practice has declined with the adoption of computer-based scheduling tools. The Precedence Diagram Method (PDM) is often favored over the Arrow Diagraming Method.

The Arrow Diagramming Method is also known as the Activity-on-Arrow (AOA) method.

[1]

ADM network drawing technique the start and end of each node or event is connected to an arrow.

The start of the arrow comes out of a node while the tip of the arrow goes into a node. Between the two nodes lies an arrow that represents the activity.

The event represented by the circular node consumes neither time nor resources.

  • A node is a specific, definable achievement in the project.
  • It has zero duration and consumes nil resources.
  • All activities that lead into a node must be completed before the activity lies following this node can start.