Metra potential method

From Wikipedia, the free encyclopedia
This is an old revision of this page, as edited by DrilBot (talk | contribs) at 17:18, 26 May 2009 (Check Wikipedia cleanup (Misplaced interwikis and categories) + gen. fixes). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

The metra potential method (MPM) was introduced by B. Roy in 1959. MPM is a means of describing interdependencies between tasks in a project graphically. Using MPM the length of the critical path is shown directly in the diagram and the critical path itself can be identified easily.