Metra potential method

From Wikipedia, the free encyclopedia
This is an old revision of this page, as edited by Michael Hardy (talk | contribs) at 19:38, 26 July 2008 (moved Metra Potential Method to Metra potential method). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

The metra potential method (MPM) was introduced by B. Roy in 1959. MPM is a means of describing interdependencies between tasks in a project graphically. Using MPM the length of the critical path is shown directly in the diagram and the critical path itself can be identified easily.