Metra potential method

From Wikipedia, the free encyclopedia
This is an old revision of this page, as edited by KathrynLybarger (talk | contribs) at 22:29, 4 March 2008 (Stub-sorting. You can help!, category). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

The Metra Potential Method (MPM) was introduced by B. Roy in 1959. MPM is a means of describing interdependencies between Tasks in a Project graphically. Using MPM the length of the critical path is shown directly in the diagram and the critical path itself can be identified easily.