Jump to content

Terminal element

From Wikipedia, the free encyclopedia
This is an old revision of this page, as edited by Mkoval (talk | contribs) at 15:36, 6 April 2003 (Article created). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.
(diff) ← Previous revision | Latest revision (diff) | Newer revision → (diff)

A terminal element project management is the lowest element (activity or deliverable) in a work breakdown structure; it is not further subdivided.

Terminal elements are the items that are estimated in terms of budget and duration, linked by dependencies and scheduled.

A terminal element is sometimes called a work package.