Jump to content

Metra potential method

From Wikipedia, the free encyclopedia
This is an old revision of this page, as edited by Redspace (talk | contribs) at 16:44, 25 December 2007 (Inital page created. Details are sparse (because this is all I know... :-)). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.
(diff) ← Previous revision | Latest revision (diff) | Newer revision → (diff)

The Metra Potential Method (MPM) was introduced by B. Roy in 1959. MPM is a means of describing interdependencies between Tasks in a Project graphically. Using MPM the length of the critical path is shown directly in the diagram and the critical path itself can be identified easily.