Programme for Rebuilding and Improving Existing Schools
Programme for Rebuilding and IMproving Existing schools (Abbreviation: PRIME) is a programme initiated by the Ministry of Education in 1999 to upgrade and rebuild existing school buildings in Singapore to provide a conducive learning environment for the students.
Flexible School Infrastructure (FlexSI)
Under this framework, school infrastructure is made more flexible to support teaching approaches that better engage students, thus giving schools more room to innovate in teaching and learning.
For example, the schools could have modular classrooms that can be opened up for larger group lectures, or partitioned for smaller group discussions; special-purpose rooms could be designed such that multiple usage of such rooms can be made possible; common areas such as corridors and study areas could be designed such that they can be expanded learning spaces.
Implementation of PRIME
Phasing
Launched in May 1999, PRIME was estimated to cost S$4.5 billion and is implemented in phases. As of February 2007, 235 schools have been included in the earlier eight phases of PRIME. Of these, 203 schools have completed their upgrading. To date, S$2.374 billion had been spent on this programme.
Eight more schools will be upgraded from 2008 to 2010 under Phase 9[1].
- Kong Hwa School
- Tampines Primary School
- Cedar Girls' Secondary School
- CHIJ St Theresa’s Convent
- Shuqun Secondary School
- Saint Hilda's Secondary School
- Tampines Secondary School
- CHIJ St. Nicholas Girls' School
On-site Rebuilding & Upgrading
Where feasible, a school will remain on-site while construction work is carried out for either upgrading or rebuilding. Otherwise, a school will move to a temporary holding school as in the case of Yishun Town Secondary School, while upgrading or rebuilding is carried out at its present site.
Relocation
Where a vacant site is available, the new school will be built on this site. The school will relocate to the new site once the school building is ready.
Mergers
To optimise the use of resources, schools may merge and be relocated.
References
- "Eight More Schools to Benefit from Upgrading" (Press release). Ministry of Education (Singapore). 2007-02-14. Retrieved 2007-02-14.
{{cite press release}}
: Check date values in:|date=
(help)