Jump to content

IRR Transversal Line

From Wikipedia, the free encyclopedia
This is an old revision of this page, as edited by JohnnyDoobydoo (talk | contribs) at 15:01, 25 December 2023 (Adding a Template of the route map.). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.


Map of the IRR Transversal Line.
IRR Transversal Line
Kirkuk to Haditha
km
IRR Eastern to Erbil
0
Kirkuk
IRR Eastern to Baghdad
16
Thawra
48
Riyadh
65
Marai
Tigris
94
Fudha
IRR Northern to Rubaiye
107
Baiji
IRR Northern to Baghdad
130
Siniya
155
Tharthar
Tharthar River
172
Safa
73.0
Wadi
192
Hidab
232
Ata
Euphrates
IRR Western to Baghdad
252
Haditha
IRR Western to Akashat

The IRR Transversal Line or the Haqlaniya-Kirkuk Railway is a railway line in Iraq that connects Haqlaniyah and Kirkuk via Bayji. It is a single-track, standard gauge (1435 mm) line that is not electrified. The line is about 252 km (157 mi) long and has a maximum speed of 100 km/h (62.1 mph). Unlike other Iraqi rail lines, it does not go through or end at Baghdad. The line is currently out of service and many parts of it are damaged or neglected, such as the bridge over the Tigris river. [1]

History

Prehistory and Metre-Gauge Railway

Ever since the latter half of the 19th century, a railway line to Kirkuk was discussed but due to the Great War construction was postponed and eventually started in 1930-1932 on the Kirkuk-Baghdad-Haifa Railway but construction on the Kirkuk Railway Station was already started in 1925. The idea of the section from Baghdad to Haifa was abandoned due to the Arab-Israeli War. In 1949 a 105-kilometre extension to Erbil was started with an iron bridge over the Great Zab River near Al-Tun. A project for an extension to Sulamaniya was initiated by the then Iraqi Director of Railways Major General Saleh Zaki Tawfiq in 1963 but was eventually abandoned with the regime change in 1968.[2]

Standard-Gauge Railway

It was planned by the Ba'athist Regime to replace the original railway with a standard-gauge railway and they renewed the idea of also extending the line to Sulaymaniya but after further considerations, it was decided to construct a brand new standard-gauge railway from Kirkuk to Haditha with an interchange at the Berlin-Baghdad Railway at Baiji. The construction of the railway line was started on August 26th, 1982 but because of the Iran-Iraq War the opening was delayed.[2] The new line was opened in 1988. A ground-breaking ceremony by the then Minister of Transport Mohammed Hamza Al Zubaidi was held on November 7th, 1987. The cost for the construction of the new line was 960 Million USD. The metre-gauge railway that connected Erbil and Baghdad via Baquba and Kirkuk was closed in 1984 by the Office of the Presidency of the Iraqi Republic. It was considered useless compared to the new line to Kirkuk, which was faster and was standard-gauge. The old line had lost its compatibility with the Baghdad-Basra Railway, which had been converted from metre- to standard-gauge. As a result, many landmarks along the old line, such as the Erbil Railway Station, the Baba Kiwan Junction, bridges, and various facilities such as hotels and hospitals, were demolished. [3][2]

Recent Progress

On November 8th, 2022 the Baiji Field Branch was rehabilitated by the Central Government.[4] Currently, there is no progress on the rehabilitation of the Kirkuk Branch due to the dispute between Baghdad and Erbil over the disputed territories, of which Kirkuk is part of.[5]

References