Jump to content

Fast probability integration

From Wikipedia, the free encyclopedia
This is an old revision of this page, as edited by Spinningspark (talk | contribs) at 17:17, 13 November 2022 (Basic description). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Fast probability integration (FPI) is a method of determining the probability of a class of events, particularly a failure event, that is faster to execute than Monte Carlo analysis. It is used where large numbers of time-variant variables contribute to the reliability of a system.

Bibliography

  • Beck, André T.; Melchers, Robert E., "Fatigue and fracture reliability analysis under random loading", pp. 2201–2204 in, Bathe, K.J (ed), Proceedings of the Second MIT Conference on Computational Fluid and Solid Mechanics June 17–20, 2003, Elsevier, 2003 ISBN 008052947X.
  • Shah, A.R.; Shiao, M.C.; Nagpal, V.K.; Chamis, C.C., Probabilistic Evaluation of Uncertainties and Risks in Aerospace Components, NASA Technical Memorandum 105603, March 1992.
  • Wen, Y.K.; Chen, H.C., "On fast integration for time variant structural reliability", Probabalistic Engineering Mechanics, vol 2, iss. 3, pp. 156-162, September 1987.