Zum Inhalt springen

CRH6

aus Wikipedia, der freien Enzyklopädie
Dies ist eine alte Version dieser Seite, zuletzt bearbeitet am 17. Februar 2019 um 15:21 Uhr durch Matthew hk (Diskussion | Beiträge). Sie kann sich erheblich von der aktuellen Version unterscheiden.

Vorlage:Infobox EMU

The CRH6 Hexie (simplified Chinese: 和谐号; traditional Chinese: 和諧號; pinyin: Héxié Hào; literally: "Harmony") is a new generation of regional/commuter high-speed train of the People's Republic of China. It is designed by CSR Qingdao Sifang Locomotive & Rolling Stock. and will be manufactured by CSR Nanjing Puzhen Rolling Stock at its subsidiary, the CSR Guangdong Jiangmen Factory.[1]

Overview

A CRH6A of the Sub-Central Line, BCR on Beijing–Kowloon railway

The CRH6 will be divided into three major types, according to stopping patterns:

  • CRH6A is the high speed version with a designed top speed Vorlage:Convert, top operating speed Vorlage:Convert to be used on regional non-stop or express services. It uses a 2+2 transverse seating layout using reversible seats that have a similar level of comfort and space to that of intercity trains. There is a toilet on cars 1, 3, 5, and 7.[2]
  • CRH6F is the higher-speed version with a designed top speed Vorlage:Convert, operating speed Vorlage:Convert to be used on express commuter services. It uses a 2+2 transverse seating layout with non-reverable seats that have a similar level of comfort and space to that of a suburban train. There is a toilet on cars 3 and 6.[2]
  • CRH6S with a designed top speed Vorlage:Convert, to be used on local commuter services. It will feature longitudinal seating arrangements similar to that of subway trains with more and larger doors for faster boarding and alighting. No models exist in revenue service but it is expected that the under construction Suiguanshen ICR will use them.

On December 29, 2009, the MOR Ordered 22 sets of Vorlage:Convert class and 10 sets of Vorlage:Convert class 6-car Intercity High Speed train from CSR Puzhen, the contract worth 2346 million RMB,[3] and now the order has been transformed into 24 sets of CRH6 and will be delivered by the end of 2012.[4][5]

Formations

CRH6A

Car No. 1 2 3 4 5 6 7 8
Designation Tc M M Tp T Mp M Tc
Numbering ZE xxxx01 ZE xxxx02 ZE xxxx03 ZE xxxx04 ZE xxxx05 ZE xxxx06 ZE xxxx07 ZE xxxx00
Capacity (seated) 45 64 64 62 64 64 64 50

CRH6A-A

Car No. 1 2 3 4
Designation Tc Mp Mp Tc
Numbering ZE xxxx01 ZE xxxx02 ZE xxxx03 ZE xxxx00
Capacity (seated) 50 78 74 50

Lines served

A CRH6F serving Changsha–Zhuzhou–Xiangtan Intercity Railway at Changsha West railway station in December 2017
CRH6A at Guangzhou-Shenzhen Railway in March 2018

Existing

Future

See also

Notes

Vorlage:Reflist

Vorlage:Commons category

Vorlage:High-speed rail in the People's Republic of China Vorlage:High-speed rail

  1. 最新型“和谐号”将是“江门造” web.archive.org Fehler bei Vorlage * Parametername unbekannt (Vorlage:Webarchiv): "date"Vorlage:Webarchiv/Wartung/Parameter Fehler bei Vorlage:Webarchiv: Genau einer der Parameter 'wayback', 'webciteID', 'archive-today', 'archive-is' oder 'archiv-url' muss angegeben werden.Vorlage:Webarchiv/Wartung/Linktext_fehltVorlage:Webarchiv/Wartung/URL Fehler bei Vorlage:Webarchiv: enWP-Wert im Parameter 'url'.
  2. a b 中国南车获国内首个城际列车项目订单. 凤凰网财经, 19. Dezember 2009, abgerufen am 23. Dezember 2010.
  3. 中国南车获国内首个城际列车项目订单 总值23.46亿人民币
  4. http://i.5h77.com/attachment/201202/24/2_1330062234ZMPD.jpg
  5. http://i757.photobucket.com/albums/xx216/davidwei01/88f89f49gw1dxwvnr0ygzj.jpg
  6. 青岛造城际动车组浙江开跑 时速160公里 - 青岛新闻网. In: news.qingdaonews.com. Abgerufen am 26. September 2017.