Jump to content

Utilization factor

From Wikipedia, the free encyclopedia
This is an old revision of this page, as edited by SchreyP (talk | contribs) at 06:52, 7 February 2013 (Reverted 2 edits by 131.236.53.160 (talk): Please use talk page for discussions. (TW)). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

The utilization factor or use factor is the ratio of the time that a piece of equipment is in use to the total time that it could be in use. It is often averaged over time in the definition such that the ratio becomes the amount of energy used divided by the maximum possible to be used. These definitions are equivalent.

Electrical engineering

In electrical engineering, utilization factor, , is the ratio of the maximum load which could be drawn to the rated capacity of the system. This is closely related to the concept of Load factor. The Load factor is the ratio of the load that a piece of equipment actually draws (time averaged) when it is in operation to the load it could draw (which we call full load).

For example, an oversized motor - 15 kW - drives a constant 12 kW load whenever it is on. The motor load factor is then 12/15 = 80%. The motor above may only be used for eight hours a day, 50 weeks a year. The hours of operation would then be 2000 hours, and the motor use factor for a base of 8760 hours per year would be 2000/8760 = 22.83%. With a base of 2000 hours per year, the motor use factor would be 100%.

Other definitions

In offshore pipeline engineering it is the ratio of the maximum allowable stress to the stress generally modelled at that section.

See also