Jump to content

Utilization factor

From Wikipedia, the free encyclopedia
This is an old revision of this page, as edited by Chongkian (talk | contribs) at 07:56, 12 January 2010 (Created page with 'In electrical engineering, '''utilization factor''' is the ratio of the maximum load on a power plant to the rated plant capacity. == S...'). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.
(diff) ← Previous revision | Latest revision (diff) | Newer revision → (diff)

In electrical engineering, utilization factor is the ratio of the maximum load on a power plant to the rated plant capacity.

See also